Start-up, Press on-stop button (light goes out). replace, Tagged wire on terminal – Carrier 19CB User Manual

Page 7: Press on-stop button ■ □ □ (light goes on)

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

With OIL PUMP button
depressed, alternately stop
and restart chilled water
and

condenser

water

p u m p s . S A F E T Y
CIRCUIT and LOAD RECYCLE lights should
go out as each pump stops. (Continuous
operation of oil pump is unnecessary during
these checks.)

ON

STOP

START

OIL

PUMP

■ □ □

n

POWER

SAFETY

LOAD

CIRCUIT RECYCLE

PROGRAM

TIMER

9. Shut off water pumps. Re-

□ □ □

lease OIL PUMP button.

ON

START

OIL

STOP PUMP

Press ON-STOP button

(light goes out). Replace

POWER SAFETY LOAO PROGRAM

tagged wire on terminal

CIRCUIT RECYCLE TIMER

(L),

10. Press ON-STOP button

■ □ □

(light goes on).

ON

START

OIL

STOP PUMP

■ ■ ■ □

POWER SAFETY LOAD PROGRAM

CIRCUIT RECYCLE TIMER

11. Press machine START

button

(motor

leads

disconnected).

Oil pump starts within 30
seconds.

Compressor motor start
contacts will close 30
seconds later. Starter will
transfer to its run condi­
tion 30 to 60 seconds
after starter is energized.

12. Open oil pump main dis­

connect. Starter must de­
energize. OIL PUMP light
will remain on for approx­
imately 5 minutes.

OIL PUMP light goes out.

ON

STOP

START

OIL

PUMP

■ ■ ■

POWER

SAFETY

LOAD

CIRCUIT RECYCLE

PROGRAM

TIMER

ON

STOP

START

OIL

PUMP

■ ■ ■

n

POWER

SAFETY

LOAD

CIRCUIT RECYCLE

PROGRAM

TIMER

ON

STOP

START

OIL

PUNIP

■ □ □

POWER

SAFETY

LOAO

CIRCUIT RECYCLE

PROGRAM

TIMER

n

ON

STOP

START

OIL

PUMP

■ □ □

POWER

SAFETY

LOAO

CIRCUIT RECYCLE

PROGRAM

TIMER

ON

STOP

START

OIL

PUMP

■ ■ ■

n

POWER SAFETY

LOAO

CIRCUIT RECYCLE

PROGRAM

TIMER

13.

Close oil pump dis­

connect. In approximately

10 minutes the program

timer will complete the
antirecycle portion of its
cycle

and

machine

is

ready to restart. (Total
recycle time —

15

minutes.)

14. Remove all power. Reconnect motor leads.

Restore power.

Purge

— Place the purge operating valves (Fig. 1) in

“Normal-Automatic” position as indicated in Oper­
ation no. 1 on the purge valve operation plate.

Operate the purge momentarily by placing the
purge switch in “Manual” position; then place
purge switch in “Auto.” position.

Air Supply (Pneumatic Controls Only)

— Check 25

psi air supply to pneumatic temperature controller
and pilot positioner.

START-UP

Before Starting Machine

— Be sure that-

Power switch is on to circuit breakers, water pumps,
tower fan and control circuit.
Cooling tower water is at proper level.
Oil is visible in reservoir sight glass.
Oil reservoir temperature is 140 F or warmer.
Oil cooler plug cock is cracked open and any other
valve in the oil cooler line is fully open.

Refrigerant is at selected design level.
Valves in cooler and condenser water circuits are

open Do not permit water above 100 F to flow thru
cooler
Filter-drier shutoff valves (Item 24, Fig. 1) are open.
Air supply for pneumatic controls is adequate

COMPRESSOR ROTATION - Electronic Control:
Set capacity control switch on “Hold.”

Pneumatic Capacity Control: Turn off supply air
to chilled water thermostat and vane positioner.

Press machine ON-STOP and START buttons.

As soon as motor begins to turn, press machine
ON-STOP button. Check motor rotation thru sight
glass on motor end bell. Motor rotation must be

counterclockwise as viewed thru sight glass.

COMPRESSOR OPERATION — Press machine
ON-STOP and START buttons and let compressor
come up to speed. Press machine ON-STOP button
and listen for any unusual sounds from compressor
as it coasts to a stop.

The program timer prevents rapid recycling and

allows compressor restart 15 minutes after stop.

Checking Safety Control Settings

■While performiiig these checks, carefully moni­
tor cMlied -vt'ateT temperature to prevent

freeze>-up. Protection by safety controls cannot
be assumed until all settings have been con­
firmed as follows:

Open main disconnect (all power off to starter

and controls).

Electronic Control: Set capacity control switch on

“Hold.”

Pneumatic Control: Ensure that pilot positioner

operates

as

described

in

Setting

Operating

Controls-Pneumatic. Then set percent load

Advertising