FINAL MACHINE ADJUSTMENT

Trimming Refrigerant Charge

— After the macliine

has been placed in operation, it may be necessary
to adjust the refrigerant charge to obtain optimum
machine performance.

When machine full load is available, using the

extra 200 pounds of refrigerant, add refrigerant
slowly until the difference between the leaving
chilled water temperature and the cooler tempera­
ture reaches design conditions or becomes a
minimum. Shut the machine down and allow
refrigerant to drain to the cooler, mark the level
indicator and maintain that shutdown refrigerant
level.

INSTRUCTING THE CUSTOMER OPERATOR

Be sure the operator carefully reads and under­

stands the I9CB Operating and Maintenance
Instructions.

Point out the following machine components,

explain their function and that of the system in

which they are used.

1. Compressor—Motor Assembly

a. Guide Vanes, Vane Positioner
b. Refrigerant-Cooled Motor

2. Cooler-Condenser-Economizer

a. Float Chamber, Sight Glasses

b. Thermowells
c. Rupture Disc

d. Refrigerant Charging Valve

3. Purge System

a. Importance of proper operation
b. Valves and System Operation
c. Sight Glasses, Gage

4. Filter-Drier System

a. Cartridge Removal

b Moisture Indicator Check

c. Shutoff Valve Function

5. Lubrication System

a. Oil Pump, Cooler, Filter
b. Solenoid Valve, Plug Cock
c. Heater, Thermostat, Temperature Gage
d. Pressure Regulating Valve
e. Oil Level, Temperature

6. Control System

a. Manual Switches (ON-STOP, START, OIL-

PUMP)

b. Gages and Lights
c. Safety Controls
d. Operating Controls
e. Auxiliary and Special Controls

7. Auxiliary Equipment

a. Starter(s)
b. Pumps
c. Cooling Tower
d. Pumpout System (where applicable)

Describe Refrigeration Cycle

Review Maintenance

1. Scheduled

2 Extended Shutdown

3 Importance of Log Sheet
4 Importance of Water Treatment

Check Operator Knowledge

1. Start-Stop Procedure

2 Safety and Operating Controls

Discuss Carrier Service

1. Availability

2. Method of Ordering Parts

Review Operating and Maintenance Instructions

For replacement items use Carrier Specified Parts.

k

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.