CANOGA PERKINS 9145E Network Interface Device User Manual

Page 31

Advertising
background image

Installation

9145E Ethernet Network Interface Device User’s Manual

Mounting Options

19

Mounting Two 9145Es, Side by Side, in a 19" or 23" Rack -

To rack mount two 9145Es,

perform the following steps:

1. Install the 19" Dual Unit or 23" Dual Unit Rack Mount Bracket Kit. The Rack Mount Kit

includes two rack mount brackets, two center brackets, a strap, a rear bracket, and the

screws required to attach the brackets to the 9145Es. The mounting brackets attach to

the two threaded holes on the outside of each 9145E, toward the front (see Figure 3-3).

The two center brackets attach to the two threaded holes on the inside of each 9145E,

and the strap mounts over the front of each center bracket (see Figure 3-5). The rear cen-

ter bracket is attached to the threaded holes at the top inside corner of the back of each

9145E (see Figure 3-6).

2. Place unit with brackets attached in place on the desired mounting rack.
3. Install two screws through each bracket into the threaded holes of the mounting rack (see

Figure 3-7). Torque the screws to the rack manufacturer’s specifications.

Figure 3-7. Mount Two 9145Es on Rack

Figure 3-5. Install Center Brackets and Strap

Figure 3-6. Install Rear Center Bracket

USER POR

T

LINK/
ACT

SPD

LINK/
ACT

RESET

POWER

STATUS

9145E-204

Advertising