Windy Nation Rover Marine Grade User Manual

Page 11

Advertising
background image

11  
 

bank.  Because  the  MG  Rover  Wind  Turbine  must  stay  under  an  electrical  load  to  operate  safely,  

the  diversion  load  charge  controller  connects  the  MG  Rover  Wind  Turbine  to  a  diversion  load.  

Generally,  large  wire  wound  resistors  or  heating  elements  are  used  as  the  diversion  load.  Once  

the  battery  bank’s  voltage  level  drops  from  a  fully  charged  level,  the  charge  controller  senses  

this  and  switches  the  MG  Rover  Wind  Turbine  back  to  charging  the  battery  bank.  

 

Section  7.0:  Battery  Charge  Controller  Requirements  for  the  MG  Rover  Wind  

Turbine  

 

WindyNation  recommends  that  a  35A  three  phase  bridge  rectifier,  Xantrex  C35  Charge  

Controller,  and  two  300  Watt  Dump  Load  resistors  be  used  with  the  MG  Rover  Wind  Turbine  to  

regulate  the  charge  of  the  MG  Rover  Wind  Turbine  to  a  12  or  24  volt  battery  bank.    

 

12  and  24  Volt  System  Charge  Controller  Parts  List  

(Windy  Nation  Part  #s  are  in  parenthesis)  

Recommended  Charge  

Controller  

Xantrex  C35

   

(

CHC-­‐XC35-­‐00)  

 

Recommended  Diversion  

Load  

12V  System:    Two  12  Volt,  300  Watt  Dump  Loads    

(DMP-­‐300W-­‐12)  

24V  System:  Two  24  Volt,  300  Watt  Dump  Loads  

(DMP-­‐300W-­‐24)  

Recommended  Three  Phase  

Bridge  Rectifier  

*35  amp  Three  Phase  Bridge  Rectifier    

(RCT-­‐35AB-­‐01)  

 

Required  Fuse  

12V  System:  30  amp  auto  reset  circuit  breaker    

(SWB-­‐CIRC-­‐30)  

24V  System:  20  amp  auto  reset  circuit  breaker  

(SWB-­‐CIRC-­‐20)  

 

Optional  Watt  Meter  

(LCD  Meter  provides  volt,  current,  

and  power  production  information)    

Windy  Nation  Watt  Meter  

(MEA-­‐DCMR-­‐01)  

 

 

Optional  Stop/Brake  Switch    

(Allows  the  Rover  Wind  turbine  to  

be  stopped  by  using  a  SPDT  switch)  

Windy  Nation  Stop/Brake  Switch  

(SWB-­‐BRK0-­‐50)  

*  Windy  Nation’s  35  amp  Three  Phase  Bridge  Rectifier  should  be  mounted  on  an  aluminum  

heatsink  to  prevent  overheating.  

 

Wiring  Instructions:  Follow  the  instructions  in  the  Xantrex  C35  Owner’s  Manual  for  wiring  the  

C35  as  a  “Diversion  Controller”.  The  C35  must  be  wired  as  a  “Diversion  Controller”  when  used  

with  the  MG  Rover  Wind  Turbine.  The  C35  Owner’s  Manual  can  be  found  on  Windy  Nation’s  

website:  