360 Systems 2470SD Time Delay User Manual

Page 31

Advertising
background image

Maintenance

31

Gigabit Ethernet Indicators

The Gigabit Ethernet port NET1 has the following indicator LEDs:

Label

Indication

Meaning

Green on

The port is connected to a valid link partner

Green flashing

Data activity

ACT/LNK

(Left)

Off

No link

Off

10 Mbps

Yellow flashing

100 Mbps

10=OFF

100=YELLOW

1000=GREEN

(Right)

Green

1000 Mbps


NET 2 is not active. Make no connection to this port.

Access to Components

Be certain to shut down the Broadcast Time Delay, turn off the rear

panel power switch and disconnect the power cord before opening the

unit for service.

The following sections provide instruction on disassembly and re-assembly for maintenance.

The front panel is removed to access the internal CD-ROM drive (for system program updates), or
to service the hard drives.

The top cover is removed to access the analog/digital audio selection jumpers, or to service an I/O
card, the system board, or power supply.

Removing the Front Panel

The front panel is easily removed for access to the CD-ROM drive, the four disk drives, or for
removing the server from an equipment rack. Using a coin or a flat-blade screwdriver, unscrew the
two large panel fasteners on the left and right sides of the face panel. Hold the panel in place while
undoing the screws. Since the loosened screws are captive, you may use them to pull the panel away
from the chassis.

To re-install the front panel, tuck all wires into the chassis and move the face panel into position.
Screw the front panel fasteners back into the chassis. Tighten the front panel access screws with a
screwdriver.

NOTE: The Broadcast Time Delay is vulnerable to accidental system reset while removing or re-
installing the front panel. It is recommended that the front panel be removed or attached only while
the system is OFF. The system can be powered ON for program updates with the front panel
removed.

Advertising