Set clock – Checkline PT-200 User Manual

Page 13

Advertising
background image

13

Set Clock

All batches are date-stamped when created, and all
measurements are time-stamped (24 hour format)
when stored into these batches. It is therefore impor-
tant to keep both the date and time current using this
menu button. Alternatively, the date and time can be
automatically updated when the gage is connected
to PosiSoft using the Gage Utilities -> Set Clock func-
tion in PosiSoft.

Layers

Measuring Multiple Layers

Measuring Multiple Layers

Advanced models only

Advanced models of the PosiTector 200 are
capable of numerically displaying up to 3 individual
layer thicknesses in a multi-layer system.

To setup the Gage for multi-layer coatings:
1. Select Layers from the Cal Settings menu.

2. Select the number of layers using the

(-) and (+) buttons.
Press to accept the value.

Couplant

Probe

Layer 1

Substrate

Layer 2

Layer 3

Total thickness

Before setting up the Gage for multi-layer
measurement, it is recommended that you first take
measurements in single layer mode and interpret the
results using the Graphics option (see pg.11)

NOTE:

Advertising