Checkline PT-200 User Manual

Page 7

Advertising
background image

7

To make adjustments:
1. Measure the coated part.
2. Select the Set Gates menu option.

3. Gate A can be changed first. Adjust the value

down (-) or up (+).
Press to accept the value and to move to
Gate B.

4. Gate B can now be changed. Adjust the value

down (-) or up (+).

5. Press to accept the value. Standard models

will exit.

6. Advanced models will display a Cursor which

allows analysis of the peaks displayed in the
Graph. Adjust the Cursor down (-) or up (+).
Press to accept Gate values and exit.

Use the Cursor to measure
multi-layer coating systems with
more than 3 distinct layers.

NOTE:

Here are some typical Gate settings...

Expected paint thickness

Gate A

Gate B

500um (20 mils) on concrete 130µm (5 mils) 1000µm (40 mils)
50µm (2 mils) on wood 25µm (1 mil) 250µm (10 mils)

The displayed thickness reading may

change when Gate values are adjusted. The new
thickness value represents the distance to the
"loudest" interface within the new A/B Gate values
(see pg.2). This handy feature makes it easy to
ignore other measurements such as surface
roughness.

For additional help with Gates see Application
Notes (pg.15)

NOTE:

Advertising