Peration of the, Ucleo, Ounter – ChemoMetec NC-200 User Manual

Page 17: Nc-200

Advertising
background image

1 Inspection, Unpacking and Installation of Equipment

991-0203 Rev. 1.1 Sep. 2012 3

1 Inspection, Unpacking and Installation of

Equipment

Upon receiving the order from ChemoMetec A/S, the box or boxes should be carefully

inspected for any damage that may have occurred during shipping. Any damage must be

reported to the carrier and to ChemoMetec A/S immediately.

Unpack the order, saving the packing materials for possible later use.

Verify that the ChemoMetec packing list received refers to the correct and ordered

materials, and that nothing is missing.

If any part of the order was damaged during shipping , is missing, or fails to operate, please

contact ChemoMetec A/S.

The document supplied with the instrument

2

:

IQ - Installation Qualification of the NucleoCounter NC-200

This document describes in details how to inspect, unpack and install the NucleoCounter

NC-200 instrument and the NucleoView NC-200 software. This IQ will also ensure that the

instruments basic functions respond correctly.

1.1

Operation of the NucleoCounter NC-200.

Before starting to use the NucleoCounter NC-200, it is important to refer to the following

document:

OQ - Operation Qualification of the NucleoCounter NC-200

This document presents a procedure which, upon successful completion, will assure that

the advanced functions of the instrument are executed correctly.

Once the IQ and the OQ are finalized successfully, actual operation with the

NucleoCounter NC-200 can begin.

2

This document is present on the USB Flash drive supplied with the instrument

Advertising