HI HLPT SERIES LOAD POINT ASSEMBLY

Page 2

tory, such damage is normally the responsibility

of the carrier and should be reported to them.

•

LOAD SENSOR CERTIFICATION SHEETS
ARE AVAILABLE 24 HOURS A DAY AT
OUR WEBSITE: http://www.hardysolu-
tions.com

•

Write down the serial number(s) on the inside of

the back cover for reference when talking to

Hardy Customer Service. Store this information

in a secure dry location for future reference.

Site Preparation

•

All mounting surfaces for the base and loading

plate must be level. The Load Point Assemblies
in a system must be level to within +/- 0.5

o

.

•

Any welding should be done prior to installation

of the load points.

Precautions

•

Always treat the Load Sensor as a precision

instrument. Leave the load point assembly in its

packaging until it is time for installation.

•

NEVER CARRY OR SWING THE LOAD SEN-

SORS BY THEIR CABLE.

•

Never allow moisture to get into any interconnec-

tions.

Basic Engineering
Principles for
Positioning Load
Point Assemblies

•

Load Points Assemblies should be positioned

such that the load (weight) is distributed as

evenly as possible between each load point

assembly in the scale.

•

When the installation does not allow even distri-

bution of the load, select higher capacity load

point assemblies. This does not effect the weigh-

ing accuracy of the scale.

•

All load point assemblies must have the same

capacity when used in one scale.