1) rough valve installation (j-thvc12), Figure 1, Valve rough-in shield – Jaclo Thermostatic Valve, Rough - J-TH34 User Manual

Page 3: 5 1/2" ref

Advertising
background image

jaclo

industries | 129 Dermody Street Cranford, NJ 07016

p 908.653.4433 | 800.852.3906 f 908.653.1717 | 800.852.4133

JACLO.COM | PG 3

CREATED 5.2014

| PG 3

(1) ROUGH VALVE INSTALLATION (J-THVC12)

1. Position valve assembly so outer edge of finished wall is between min./max. thicknesses marked on rough in

shield. See Fig. 1

2. Using appropriate fasteners, mount valve assembly to studs/blocking. See Fig. 1

VALVE ROUGH-IN SHIELD

INSTALLATION EXAMPLE

"JACLO INDUSTRIES PROPRIETARY INFORMATION"

THIS DRAWING CONTAIN CONFIDENTIAL PROPRIETARY

INFORMATION AND IDEAS BELONGING TO JACLO INDUSTRIES.

DRAWING ARE BEING DISCLOSED IN CONFIDENCE FOR A LIMITED

PURPOSE AND MUST BE RETURNED UPON REQUEST. IT MAY

NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE

REPRODUCED, COPIED, OR DISCLOSED TO OTHER PARTIES

WITHOUT THE PRIOR WRITTEN CONSENT OF JACLO INDUSTRIES.

5 3/4"

3 3/8"

5 1/2" REF.

4 3/16"

16 PT.

SPLINE

3/4" NPT 3x

5 1/2" REF.

OUT

2 3/16"

ROTATE LEVER

THERMOSTATIC

TEMPERATURE

CONTROL

C PORT

FULL ON

FULL ON

OFF

ROTATE LEVER

OFF

WARM

HOT

ROTATE LEVER

WARM

ROTATE LEVER

FOR VOLUME

CONTROL

Figure 1

TO SHOWERHEAD OR
OTHER PLUMBING
ASSEMBLY

1" THICK FINISHED
WALL OUTER EDGE

4½" Ø
Max

4½" DIA. MAX
HOLE IN WALL

SAMPLE HOLE IN WALL

TO TUB SPOUT ONLY

TWIN EL SUPPLIED

Advertising
This manual is related to the following products: