INSTALLATION

6

To avoid damage to the unit, when pressure
testing gas piping, isolate the unit from the
supply gas piping. At no time should there be
more than 14” W.C. the unit. Bubble test all
external piping thoroughly for leaks using a
soap and water solution or suitable equivalent.
The gas piping must meet all applicable codes.

2.4.1 GAS SUPPLY PRESSURE
REGULATOR

An external, in-line, supply gas regulator
(supplied by others) should be positioned as
shown in figure 2.7. Union connections should
be placed in the proper locations to allow
maintenance of the regulator if required

NOTE:

An individual gas pressure regulator must

be installed upstream of each KC1000. The

regulator must regulate gas pressure to 8.5”

W.C. at 1,000,000 BTU/H for natural gas

and propane units.


The maximum static inlet pressure to the unit
must be no more than 14” water column.
Minimum gas pressure is 8.5” W.C. for FM gas
trains and 8.9” W.C. for IRI gas trains when the
unit is firing at maximum input. Gas pressure
should not exceed 10.5” W.C. at any time when
firing. Proper sizing of the gas supply regulator
in delivering the correct gas flow and outlet
pressure is mandatory. The gas supply pressure
regulator must maintain the gas pressure at a
regulated 8.5” W.C. minimum for FM gas trains
and 8.9” W.C. for IRI gas trains at maximum
BTU input (1,000,000 BTU/HR) for natural gas
and propane installations. The supply gas
regulator must be of sufficient capacity volume,
(1000 cfh), for the unit and should have no more
than 1" droop from minimum to full fire. The
supply gas regulator must also be rated to
handle the maximum incoming gas pressure to
it. When the gas supply pressure will not exceed
14” W.C. a non-lock up or flow through style
regulator may be used. When supply gas
pressure will exceed 14” W.C. a lock up style
regulator must be used. The gas supply
regulator must be propery vented to outdoors.
Consult the local gas utility for exact

requirements concerning venting of supply gas
regulators.

CAUTION!

A lockup style regulator must be used when

gas supply pressure exceeds 14” W.C.

Figure 2.7

Gas Supply Regulator and Manual Shut -Off

Valve Location

2.4.2 MANUAL GAS SHUTOFF VALVE

A 1-1/4” manual gas shut-off valve is furnished
with each unit. The valve should be positioned
as shown in Figure 2.7. The manual gas shut-of
valve must be installed upstream of the supply
regulator in a readily accessible location.

2.4.3 IRI GAS TRAIN KIT

The IRI gas train is an optional gas train
required in some areas by code or for insurance
purposes. The IRI gas train may be ordered pre-
assembled or as separate components. If either
IRI gas train option is ordered a complete
instructional package, detailing field installation
will be included. To obtain a copy of an IRI
instructional package prior to the equipment
shipping contact your local representative or
AERCO. (See appendix F)


2.5 ELECTRICAL SUPPLY

The AERCO Gas Fired Equipment Electrical
Power Wiring Guide, (GF-1060), must be
consulted in addition to the following material
before wiring to the unit is started. The location
of the electrical wiring box is on the front right
side of the unit as shown in Figure 2.8.

Advertising