Installation, operation & maintenance – AERCO Modulex General Manual User Manual

Page 6

Advertising
background image

INSTALLATION, OPERATION & MAINTENANCE

iv


WARNINGS CONTINUED

• This INSTRUCTION MANUAL is an integral and indispensable part of the product. It must be

given to the user by the installers and must be kept in a safe place for future reference. In the
event that the boiler is transferred or sold, the manual must accompany the equipment.

• This boiler must be used only for the purposes for which it has been designed. Any other use

shall be considered incorrect and dangerous, thereby voiding the warranty

• The boiler must be installed in compliance with applicable laws and standards and according to

the manufacturer’s instructions given in this manual. Incorrect installation may cause injury to
personnel and/or damage to property. The manufacturer shall not be held liable for any such injury
and/or damage.

• Damage and/or injury caused by incorrect installation or use, or failure to observe the

manufacturer’s instructions shall relieve AERCO from any and all contractual and extra
contractual liability.

DO NOT obstruct the air suction to the boiler room and/or heat dissipation devices in any other

room.

• Keep the packaging out of the reach of children as it may represent a choking and suffocation

hazard.

• Non-observance of the above requirement may jeopardize the safety of the boilers and expose

people, animals and property to danger.

CAUTIONS appear here and in one or more Chapters of this
manual.

• CAUTION, THE IGNITER MAY BE HOT. USE CARE TO AVOID SERIOUS BURNS

• Caution must be observed to prevent damage to the AERCO Modulex Boiler or associated

equipment. Failure to observe precautions may also void the Boiler warranty.

• Prior to installing the boiler, check to ensure that the technical data corresponds to

requirements for its intended use in the system.

• Check that the boiler is intact and that it has not been damaged during transport and handling. Do

not install equipment, which is evidently damaged and/or faulty.

• Only original accessories must be used for all boilers supplied with options or kits (including

electrical ones).

• Dispose of the packaging with care, as all the materials can be recycled. The packaging must

therefore be sent to specific waste management sites.

• In the event of failure and/or faulty functioning, switch off the boiler. Do not attempt to make

repairs: contact qualified technicians. Original parts must be used for all repairs to the boiler.

• In the event of long periods of inactivity of the boiler, disconnect it from the power mains and close

the gas valve. (In this case, the boiler’s electronic anti-freeze function will not be operative.)
Should there be a risk of freezing, add anti-freeze: it is not advisable to empty the system as
this may result in damage; use specific “aluminum-friendly”, neutral pH anti-freeze products
suitable for multi-metal heating systems.

To guarantee efficiency and correct functioning of the equipment it is legally binding to
service the boilers once a year according to the schedule indicated in the relative
section of this manual.

Advertising