8. Hydrostatically Testing Coils & Risers













9. Reassembly of Shell













10. Reinstalling Heater in Facility

Reassemble all components that were disconnected in paragraph 5.2. When re-installing the Thermal

Element into the Thermal Well Bushing in the Top Head, be careful not to damage the Element against

the internal Coils. Straighten the Element before inserting.

11. Startup Procedure

Follow the Operating Procedures in the appropriate O & M Manual listed in paragraph 3 (Reference

Documents).


Hydrostatically Testing Coils & Risers

1) Install fittings into the inlet and outlet of the Bottom for the Risers that can supply a hydrostatic

pressure source.

2) One fitting should have a valve for the release of internal air pressure.
3) The other fitting should be attached to a source to apply the maximum allowable working pressure,

(MAWP) to the internal Coil and Riser Bundle.

4) Apply MAWP to the Coil Bundle.
5) Close off both inlet and outlet valves to retain the internal pressure for 20 minutes.
6) If leaks are detected, remove the internal pressure.
7) Remove the leaking Coil and inspect for causes for leak.
8) If the leak is due to debris, clean the Coil and reinstall.
9) If there are damages to any surfaces, contact your AERCO Representative for instruction for returning

the failed Coil.

Section 8. Instructions

END

Reassembly of Shell

1) Install fittings into the inlet and outlet of the Bottom for the Risers that can supply a hydrostatic

pressure source.

2) One fitting should have a valve for the release of internal air pressure.
3) The other fitting should be attached to a source to apply the maximum allowable working pressure,

(MAWP) to the internal Coil and Riser Bundle.

4) Apply MAWP to the Coil Bundle.
5) Close off both inlet and outlet valves to retain the internal pressure for 20 minutes.
6) If leaks are detected, remove the internal pressure.
7) Remove the leaking Coil and inspect for causes for leak.
8) If the leak is due to debris, clean the Coil and reinstall.
9) If there are damages to any surfaces, contact your AERCO Representative for instruction for returning

the failed Coil.

Section 9. Instructions

END