Time line view – AltiGen MAXCS 7.0 Update 1 MaxInSight User Manual
Page 23

MaxInSight Manual
19
Conf
iguring Dat
a
Displays
Time Line View
A time line view is used to display trends of data elements over
time. The data points are plotted on a graph and connected with
lines.
To set parameters for a time line view,
1. Choose Add > Add Time Line View.
2. Select one or more workgroups. To select a workgroup,
highlight the workgroup and click the Right-arrow button.
3. To specify the color of the lines, highlight a selected
workgroup, click Set Color and select a color. Repeat for each
additional workgroup.
4. From the Select Field drop-down list, select a field to chart .
Only the fields of data from the logger service you specified at
login will appear in the drop-down list. (The logger service is
shown in the Current Data Source field.)