Time line view – AltiGen MAXCS 7.0 Update 1 MaxInSight User Manual

Page 23

Advertising
background image

MaxInSight Manual

19

Conf

iguring Dat

a

Displays

Time Line View

A time line view is used to display trends of data elements over
time. The data points are plotted on a graph and connected with
lines.
To set parameters for a time line view,
1. Choose Add > Add Time Line View.

2. Select one or more workgroups. To select a workgroup,

highlight the workgroup and click the Right-arrow button.

3. To specify the color of the lines, highlight a selected

workgroup, click Set Color and select a color. Repeat for each
additional workgroup.

4. From the Select Field drop-down list, select a field to chart .

Only the fields of data from the logger service you specified at
login will appear in the drop-down list. (The logger service is
shown in the Current Data Source field.)

Advertising