Blade preparation and installation – Vermont Casting Vermont Ceiling C34G624M User Manual

Page 12

Advertising
background image

12

blAde PrePArATioN ANd iNsTAllATioN

blade irons (5)

blade Medallions (5)

blades (5)

screw Pack C

blade screws (21)

screw Pack d

blade iron screws (11)

Step 4a.

Attach blade to bladeholder by first pressing

the blade badge onto the blade (Pack C), then attaching
the bladeholder using the four blade screws provided
as shown in Figure #1. using the provided screwdriver,
tighten securely by hand only. Repeat for each blade
assembly.

Step 4b. Attach each blade/bladeholder assembly to
the motor by threading two blade iron screws (Pack
d) through the matching holes in the blade iron and
the motor as shown in Figure #2. using the Phillips

screwdriver, tighten the screws loosely. After all five
blade assemblies have been installed, tighten the
screws with the screwdriver as shown in Figure #3.

blAde hArdWAre (not to scale)

blade screws

blade iron

blade badge

Motor

blade iron

and blade

Figure #1

Figure #2

Figure #3

Advertising