Kenmore 122.1643101 User Manual

Page 14

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

15. Electronic Ignition Battery Installation

Unscrew the electronic ignition button and place the

Battery (ZE) into the housing with the positive terminal

(+) facing outward. Replace the ignition button after

the battery has been installed as shown in Fig. 23.

16. Install the Grease Tray & Charcoal Ash Tray

Install the Grease Tray (ZF) from the rear of the grill

by sliding it all the way onto the glides underneath Gas

firebox. Insert Grease Cup (ZF) into Grease Tray. See

Fig. 24.

Note: Grease Tray Funnel must be toward the center

of the grill.

Install the Ash Tray (ZG) by sliding it all the way onto

the glides underneath the Charcoal firebox. See Fig.

24.

17. Installing Cooking Components

IMPORTANT:

Before cooking on your grill the first

time, wash cooking grids and cooking rack with warm ,

soapy water. Rinse and dry thoroughly. Season with

cooking oil regularly. After cooking is completed, turn

grill to HIGH setting for 3 to 5 minutes to burn off

excess grease or food residue.

a) . Install Heat Diffusers (ZH) above burners so that

holes in diffuser corners attach securely onto pegs in

the back ledge of firebox. See Fig. 25.

b) . Evenly space Cooking Grids (ZK) over Diffusers on

gas side of Grill. Insert Charcoal Cooking grid (Zl)

above charcoal tray on Charcoal side of Grill. See Fig.

25.

c) . Insert Charcoal Warming Rack (ZJ) and Gas Grill

Warming Rack (ZL) into rack glides on top of side

panels of each firebox. See Fig. 25.

14

Advertising