EVCO EVD120 User Manual

Page 10

Advertising
background image

10

EVD120

Getting started

1.2

Wiring diagram

Fig. 3 - Wiring diagram of EVD120.

With reference to the wiring diagram:

•

port 1 is the port for the serial communication (via RS-485, with MODBUS communication protocol)

•

port 2 is the serial port for the communication with the programming key.

Additional information for electrical connection:

•

do not operate on the terminal blocks with electrical or pneumatic screwers

•

if the instrument has been moved from a cold location to a warm one, the humidity could condense on the inside;

wait about an hour before supplying it

•

test the working power supply voltage, working electrical frequency and working electrical power of the instrument;

they must correspond with the local power supply

•

disconnect the local power supply before servicing the instrument

•

provide the probes with a protection able to protect them against contacts with metal parts or use insulated probes

•

do not use the instrument as safety device

•

for repairs and information on the instrument please contact Evco sales network.

Advertising