INSTALLATION

It is imperative that this unit is installed and operated with the designed airflow, gas, and electrical supply
in accordance with this manual. If there are any questions about any items, please call the service
department at 1-866-784-6900 for warranty and technical support issues.

Mechanical

WARNING: DO NOT RAISE VENTILATOR BY THE INTAKE HOOD, BLOWER OR
MOTOR SHAFT, OR BEARINGS

– USE LIFTING LUGS PROVIDED OR A SLING

Site Preparation

1. Provide clearance around installation site to safely rig and

lift equipment into its final position. Supports must
adequately support equipment. Refer to manufacturer’s
estimated weights.

2. Consider general service and installation space when

locating unit.

3. Locate unit close to the space it will serve to reduce long,

twisted duct runs.

4. Do not allow air intake to face prevailing winds. Support

unit above ground or at roof level high enough to prevent
precipitation from being drawn into its inlet. The inlet must
also be located at least 10 feet away from any exhaust
vents. The heater inlet shall be located in accordance with the applicable building code
provisions for ventilation air. All air to the heater must be ducted from the outdoors. Recirculation
of room air is not permitted. If in doubt regarding the application, consult the manufacturer.

Assembly

Intakes and curbs are shipped unassembled. Upon unit arrival, follow the following procedure to
assemble the intake to the heater:

1. Apply silicone or weather-proof gasket on

the back side of the flanges of the intake
hood or v-bank intake.

2. Screw the flanges of the intake hood or v-

bank to the unit with the supplied sheet
metal screws. Place caulk on the outside of
the screws to prevent water leaks. If the
unit is a modular unit with a v-bank or
evaporative cooler section, the v-bank or
evaporative cooler will bolt to the heater with the bolts provided.

Curb and Ductwork

This fan was specified for a specific CFM and static pressure. The ductwork attached to this unit will
significantly affect the airflow performance. Flexible ductwork and square elbows should not be used.
Also, transitions and turns in ductwork near the fan outlet will cause system effect and will drastically
increase the static pressure and reduce airflow. The chart below shows the minimum fan outlet duct
sizes and straight lengths recommended for optimal fan performance. Follow SMACNA guides and
recommendations for the remaining duct run.
Fans designed for rooftop installation should be
installed on a prefabricated or factory built roof curb. Follow curb

manufacturer’s instructions for proper

curb installation.

The unit should be installed on a curb and/or rail elevated not less than 20” above any

CLEARANCES

The top,

back, and

front

surfaces of this heater may not
be installed le

ss than 6” from

combustible materials. The
heater base may be installed
on

combustible

surfaces.

Allow 24” minimum service
clearance on both sides of this
heater.

Advertising
This manual is related to the following products: