2 unpacking and assembly – KERN & SOHN MLS 50-3C User Manual
Page 15
Advertising

MLS_C-BA-e-1330
15
6.2 Unpacking and assembly
Take the moisture meter carefully out of its packaging, remove the plastic jacket and
install it at the designated work space.
The moisture meter is supplied part-assembled. Control whether the delivery is
complete immediately after unpacking the individual parts and assemble the separate
component parts according to the enclosed diagram.
Put on the dish retainer carefully, ensuring correct positioning:
Level instrument with foot screws until the air bubble of the water
balance is in the prescribed circle.
Check levelling regularly.
Sample dish
Dish retainer
Removal aid
Windshield
Windshield base plate
Advertising