LAARS 9600 CB - Installation, Operation and Maintenance Instructions User Manual

Page 10

Advertising
background image

Page 10

LAARS Heating Systems

Figure 11. Piping diagram for modular units and/or hydro air systems.

Figure 12. Wiring diagram.

1.12 Return Connections

a.

Install a strainer between CB and system.

b.

Connect the 1¼" return connection on the unit to
the return side of the system circulating loop.

c.

Install a check valve (multiple units only), a
shutoff valve and a drain valve near the unit in the
return line.

d.

Install a properly sized circulator in the system
loop.

1.13 Cold Water Make-Up

a.

Connect the cold water supply to the inlet
connection of an automatic fill valve.

b.

Install a suitable back flow preventer between the

Advertising