Out of production – LAARS Horizon - Installation, Operation and Maintenance Instructions User Manual

Page 6

Advertising
background image

Page 6

LAARS Heating Systems Company

Figure 2.

1. FIT FRONT PANEL (1)
2. ATTACH SIDE PANELS (2) AND (3) TO

BOTTOM OF BOILER AND FRONT
PANEL

3. FIX REAR PANELS (4) AND (5) TO SIDE

PANELS

4. FIT TOP PANEL (6)

Relief Valve

Bolted Coil Flange for easy
re-tightening - no Studs to
break

Aquastat Relay

Domestic Water Connections

Removable Flue Cover for
easy tube cleaning

CO

2

and Draft Test Plug

Flame Observation Glass
CO

2

and Draft Test Plug

Flame Retention Oil Burner

Glass fiber Rope for positive
gas tight seal
Flame Reverse Combustion

Vent Pipe

Hydronic Supply

with dip tube

Heavy gauge Enamelled Jacket

Tankless Coil 4 gal./min. in

hottest zone

Horizontal Fire Tube Design

Stainless Steel Flue Gas

Tubulators for optimum heat

transfer and highest efficiency

Flue Cleaning Ports

Flue Collector external fixing

no bolt corrosion

Extra Heavy Duty Insulation

for low stand-by losses

Hydronic Return

Sludge Clean-out Socket

SIDE PANEL TO FRONT

PANEL FIXING

OUT OF

PRODUCTION

Advertising