V Knockdown Boiler Assembly Instructions

10

A. Prior To Assembly

1)

Thoroughly inspect the cast iron heat exchanger sections for any shipping damage, i.e. cracks in the castings, broken lugs
or punctures due to mishandling.

2)

Do not use a damaged heat exchanger section. Replace it with an undamaged heat exchanger section.

3)

Keep the base in the shipping carton until it is time to perform the assembly. This keeps foreign material from contami-
nating the burners or creating other hazards. Do not use the base assembly if there are any signs of visible damage.

4)

Review all of the installation requirements in this installation manual.

5)

Verify that all needed components are on hand. A complete list of all sections and cartons that should be on hand,
along with their contents, can be found in the Parts Section. A summary of the cartons and their contents is shown
below. All boilers except the 32-475 use multiple base modules and therefore require multiple Base Cartons and
Intermediate Cartons. All boilers larger than the 32-855 require multiple Section Joiner Cartons. Some parts, such as
jacket screws and jacket mounting brackets are packed in both the Base Carton and the Base Side Panel Carton.

B. Base Assembly

1)

Each base module is tested and shipped assembled.

a.

All boilers are assembled using base modules with inputs of 285, 380 and 475 MBH

b.

The model 475 boiler requires only a single base module. All other boiler combinations require multiple
base module subassemblies. See Figure 2 for the proper order of assembly.

c.

Join Base Sub-assemblies together. Use (4) 3/8”-16 x 3/4” screws, nuts and washers to attach subassemblies. (See
Figure 4)

d.

Assemble the base in the location where the boiler is to be installed. Refer to Sections III and IV in this
manual for additional information on placement.

e.

Once the base modules are assembled, install the base end panels. These base end panels must be installed
prior to assembling the sections.

f.

The base must be level in both directions and supported under all feet. Shim and grout under base if
necessary.

g.

Verify that the front and sides of the base are square.

h.

Place cardboard covering over the top of the burners to protect them during the assembly of the boiler
sections.

P A CKA GE

JA CKET SIDE P A NEL CA RTON

TA NKLESS HEA TER CA RTON

P OP SA FETY OR RELIEF VA LVE
FITTINGS FOR M OUNTING P OP SA FETY OR RELIEF VA LVE

WA RRA NTY
P USHNIP P LE GA UGE
RA TING P LA TE
SEA LA NT FOR SEA LING HEA T EXCHA NGER TO B A SE

TA NKLESS COIL OP ENING COVER P LA TES A ND HA RDWA RE
A SSORTED FITTINGS
INSTA LLA TION M A NUA L
USER'S M A NUA L

TA NKLESS HEA TER (IF USED)

LEFT A ND RIGHT SIDE JA CKET P A NELS
LIM IT CONTROLS
GA UGE
LOW WA TER CUT-OFF (CSD-1 B OILERS ONLY)
TA NKLESS COIL OP ENING COVER P LA TES A ND HA RDWA RE
A SSORTED FITTINGS
LIM IT CONTROLS
GA UGE
LOW WA TER CUT-OFFS

P USHNIP P LE LUB RICA NT
SECTION SEA LING COM P OUND
B A SE SIDE P A NELS
B RA CKETS A ND HA RDWA RE FOR A TTA CHING JA CKET A ND FLUE COLLECTOR TO SIDES OF B OILER

WA TER TRIM CA RTON

STEA M TRIM CA RTON

B OILER CA RTON

SUM M A RY OF CONTENTS

B A SE M ODULE
B RA CKETS A ND HA RDWA RE FOR A TTA CHING JA CKET A ND FLUE COLLECTOR
FRONT, TOP , REA R JA CKET P A NELS
FLUE COLLECTOR
P USHNIP P LES
TIE ROD HA RDWA RE

B A SE CA RTON

INTERM EDIA TE CA RTON

SECTION JOINER CA RTON

B A SE SIDE P A NEL CA RTON

Advertising