Longshine LCS-C841MC User Manual

Page 18

Advertising
background image

1000Base-T to 1000Base-SX/LX Converter

14

Installation

Note:

The devices attached to each port can be

connected and operating in any sequence, but
the factory recommended procedure is as follows:

1. Converter power OFF
2. Set DIP switch(es) (ON or OFF)
3. Power ON the converter
4. Connect Fibre links
5. Connect Copper links


Desktop Installation

Follow the instructions listed below to install the Converter
onto a desktop location.

1. Locate the Converter in a clean, flat and safe position

that has easy access to AC power.

2. Affix the four (4) self-adhesive rubber pads to the

underside of the Converter.

3. Apply AC power to the Converter. (The green PWR

LED on the rear panel should light).

4. Connect cables from the network partner devices to

the ports on the front panel. (The green LNK LED on
the front panel associated with the port should light).

Advertising