NORAC UC4.5-BC-VS1 User Manual

Page 20

Advertising
background image



17

Figure 18: Cable Configurations: C03, C12 and C11

4. Run cable C11 to the rear of the sprayer, in the vicinity of the valve block.

5. Connect the 6-pin shroud on C12 to T6 on C11.

6. Route the free end of C12 to the Versatile valve block.

7. Insert 2 sets of the Deutsch connector tees (which are labeled as “MAIN UP”, “MAIN UP”

and “MAIN DOWN” on the branch wires, one Main Up will not be used) between the
matching Versatile valve connections.

8. Unplug the existing connectors on the Versatile left and right boom control valve

connections. There are 4 connectors to unplug: LEFT UP, LEFT DOWN, RIGHT UP and
RIGHT DOWN.

9. Plug in the 2-pin Deutsch connectors of C12 to the matching connectors of Rogator

cable(s). For each connector, the function (e.g. “LEFT UP”, etc.) is labeled on the branch
wire of C12.

10. Connect the valve interface cable (C03) to connector S6 on the valve extension cable

(C11).

11. Connect the 2-pin connectors on the valve interface cable to the NORAC valve block, as

shown in Figure 19.

Advertising