12. Install the 2-pin connectors from C03

onto each NORAC valve as shown in
Figure 35.

13. The connectors on the valve cable

(C03) are marked RIGHT UP, LEFT
UP
, RIGHT DOWN and LEFT
DOWN
. Cables labeled with UP go
on the same side as the hydraulic hoses.

Figure 35: Valve Cable Connections

14. Connect the CAN Node cable (C02B)

to the 4-pin AMP plug on C01

15. Route C02B to the roll sensors which

are installed in Section 4.5. Follow
existing cables and/or hydraulic lines.

16. Connect the sensor branch cable (C02)

to the 4-pin AMP plug on C02B
(Figure 36).

17. Route C02 to the wing and main

sensors and connect to the sensors.
Follow existing cables and/or hydraulic
lines along the boom.

Route the main lift cable through

the main lift mounting bracket

tube to provide additional cable
protection

18. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.

Figure 36: Cable Configurations: C01,

C02 and C02B