Carrier 38YRA User Manual

Page 3

Advertising
background image

7. Do not suspend refrigerant tubing from joists and studs with a

rigid wire or strap which comes in direct contact with the
tubing. (See Fig. 3.)

8. Ensure that tubing insulation is pliable and completely sur-

rounds the vapor tube.

9. When necessary, use hanger straps which are 1 in. wide and

conform to the shape of the tubing insulation. (See Fig. 3.)

10. Isolate the hanger straps from the insulation by using metal

sleeves bent to conform to the shape of the insulation.

If refrigerant tubes or indoor coil is exposed to atmospheric
conditions for longer than 5 minutes, it must be evacuated to 500
microns to eliminate contamination and moisture in the system.

OUTDOOR UNITS CONNECTED TO FACTORY-APPROVED
INDOOR UNITS — Outdoor unit contains correct system refrig-
erant charge for operation with indoor unit of the same size when
connected by 15 ft of field-supplied or factory accessory tubing.
Check refrigerant charge for maximum efficiency. (See Step
10—Checking Charge.)

REFRIGERANT TUBING — Connect refrigerant tubing to fit-
tings on outdoor unit vapor and liquid service valves. (See Fig. 2.)

Table 1—Refrigerant Connections and Recom-

mended Liquid and Vapor Tube Diameters (In.)

UNIT

SIZE

LIQUID

VAPOR

Connect

Diameter

Tube

Diameter

Connect

Diameter

Tube

Diameter

018

3/8

3/8

5/8

5/8

024-030

3/8

3/8

3/4

3/4

036-048

3/8

3/8

7/8

7/8

060

3/8

3/8

7/8

1-1/8

Note: Tube diameters are for lengths up to 50 ft. For tubing lengths greater
than 50 ft, consult Long-Line Application Guideline.

To avoid valve damage while brazing, service valves must be
wrapped with a heat sinking material such as a wet cloth.

SWEAT CONNECTION — Use refrigerant grade tubing. Service
valves are closed from factory and ready for brazing. After
wrapping the service valve with a wet cloth, the tubing set can be
brazed to the service valve using either silver bearing or non-silver
bearing brazing material. Remove plastic retainer holding outdoor
piston in the liquid service valve and connect sweat adapter
provided to valve. (See Fig. 7.) Consult local code requirements.
Refrigerant tubing and indoor coil are now ready for leak testing.
This check should include all field and factory joints.

Fig. 3—Piping Installation

A94028

INSULATION

VAPOR TUBE

LIQUID TUBE

OUTDOOR WALL

INDOOR WALL

LIQUID TUBE

VAPOR TUBE

INSULATION

CAULK

Avoid contact between tubing and structure

NOTE:

THROUGH THE WALL

HANGER STRAP

(AROUND VAPOR

TUBE ONLY)

JOIST

1

MIN.

SUSPENSION

Fig. 4—Accessory Support Feet

A93567

Fig. 5—Typical TXV Installation

A88382

THERMOSTATIC
EXPANSION
VALVE

EQUALIZER
TUBE

SENSING
BULB

COIL

Fig. 6—Positioning of Sensing Bulb

A81032

2 O'CLOCK

10 O'CLOCK

SENSING BULB

STRAP

SUCTION TUBE

8 O'CLOCK

4 O'CLOCK

7

8

IN. OD & SMALLER

LARGER THAN

7

8

IN. OD

3

Advertising