12 assemble window filler panels 6 – Perfect Aire PNC18000 User Manual

Page 13

Advertising
background image

12

Assemble Window Filler Panels

6

Window Sash Seal

Safety Lock

3 4

LongHex-head

Screws

(or1/2 )

7

1.Trim sash seal to fit window width. Insert

into space between upper and lower sashes.

1. Lift air conditioner and carefully slide into

cabinet leaving 6 inches protruding.

2. DO NOT push on controls or finned coils.

3. Be sure chassis is firmly seated towards

rear of cabinet.

4. Installation of front is the reverse of removal

outlined in Section 1.

Fig. 15

Fig. 16

Fig. 17

8

Extend Window Filler Panels

Install Window Lock and Sash Seal

Install Chassis into Cabinet

and Install Front to Unit

Locking Screw

7/16" Locking

Screw

and Washer

Advertising