1 inlet air and exhaust air options (cont’d), 2 power exhaust, option pe – Reznor YDSA Unit Installation Manual User Manual

Page 36

Advertising
background image

Form I-Y, P/N 273646R6, Page 36

Outside Air Only Dampers, Option AR8, AR2D, AR2L, or AR2Y

- The

damper motor is electrically interlocked with the blower (supply fan) motor via an inter-

nal end switch, such that a command to start the fan opens the damper first. When

the damper reaches 80% open, the end switch closes, and the supply fan will operate.

When the supply fan is called to be OFF, the damper closes

NOTE: To verify control

option selection, check the

option listing on the wiring

diagram and the option list

in the

APPENDIX, pages 68

thru 73.

Outside Air & Return Air Dampers, Option AR25, AR2G, AR2H, or

AR2M

- If outside and return air motorized dampers were ordered, there are a variety

of damper control options (Option GF). Some require field installation. If the damper

control sensing option requires field installation of components, the components are

shipped with the unit and include the manufacturer's instructions. Install according to

the instructions and connect the wires according to the unit diagram. Follow the wiring

recommendations in Paragraph 7.5.2.

Senses

Option Installation and Function

Remote Damper Control, DDC

GF1

Damper position is adjusted by the controller in response to a field-supplied remote 0-10V

input signal.

Two Position Damper Control (open/

closed), DDC

GF2

Sends message to open or close dampers as required. Damper opens to a fixed setpoint

during occupied mode and closes during unoccupied mode.

Four-Position Damper Control

GF4

Factory installed to provide four damper settings from two switches. Each input represents a

position. As the input changes, the controller changes the damper position.

Building Static Pressure

GF5

Factory installed to monitor building pressure for damper operation. Requires field-installation

of sensor. See instructions in Paragraph 9.1.2 below.

Outside Air Dry Bulb Economizer

w/Dual Reference Enthalpy Control

GF8

Economizer package, CO

2

& Dual Reference enabled.

Inlet Air Damper

Control Options

9.1.2 Power Exhaust,

Option PE__

If equipped with optional power exhaust as illustrated in

FIGURE 21, page 35 (Option

AR2D or AR2H), the power exhaust will then be controlled in response to one of the

following control options. Power exhaust opening has gravity dampers.
NOTE: Power exhaust is also a part of airflow configurations that include the energy

recovery wheel (Option AR2L and AR2M) discussed in Paragraph 9.1.3.)

Senses

Option Installation and Function

2 Speed Fan Control Based on

Active Heating or Cooling Mode EFC1

Exhaust airflow is factory set to order specifications but is adjustable via the unit controller.

Building Static Pressure

EFC4

Factory installed to monitor building pressure for exhaust operation. Requires field-installation of

sensor. See instructions below.

Supply Fan Tracking with

Adjustable Offset

EFC7

Power exhaust is set to operate in relation to the supply fan. The offset is adjustable via the unit

controller.

Constant Volume

EFC9

Exhaust airflow is factory set to order specifications but is adjustable via the unit controller.

Power Exhaust Control

Options

Instructions for Field-

Installed Building Static

Pressure Sensor in

Option GF5 or Option

EFC4

During startup, the CFM will need to be checked for the supply fan and optional exhaust

fan. Follow the instructions in Paragraph 10.3 to use the unit interface TAB Menu and

the airflow / pressure drop chart on pages 69 thru 73 to determine the airflow settings.

Setting Exhaust Fan

CFM

Tranducer in the

Control Compartment

Tubing Requirements - All tubing is field supplied. The transducer is equipped with

1/4” O.D. pressure fittings for the pressure signal connection. Both the positive (high)

pressure port and the reference (low) pressure port are located on the front of the

transducer, labeled “HIGH” and “LOW” respectively.
For best results (shortest response times), 3/16” I.D. tubing is suggested for tubing

lengths up to 100 feet (30M), 1/4” I.D. for tubing lengths up to 300 feet (91M), and 3/8”

I.D. for tubing lengths up to 900 feet (274M)
Building Pressure Control Pickup Tubes

- Both pickup tubes for building pressure con-

trol are field supplied. Install a pickup tube in the building. To sense atmospheric pres-

sure, route the tubing to one of the small holes in the cabinet panel and install a field-

supplied pickup tube designed for outdoors.
As determined by the application, attach the tubing from the positive (high) pressure

pickup to the “high” connection on the transducer and the reference (low) pressure

pickup tube to the “low” connection on the transducer.
Verify Installation and Operation

- Be sure that tubing connections are correct and

attached securely. On startup, verify that there is a pressure reading displayed on the

unit controller.

NOTE: Same type as Option

VFC4. For additional infor-
mation, see

Paragraph 8.2.

9.1 Inlet Air and Exhaust Air Options (cont’d)

9.0 Optional Equipment including Heat Sections (cont’d)

Advertising
This manual is related to the following products: