Installation instruction – Reznor R6GF Option - Installation - Economizer - Light Commercial User Manual
Page 2

Step 1:
Inspect economizer for shipping damage and correct parts with
list below.
1
-
Economizer Assembly w/ Filter installed
3
-
Upper Adaptor Panels
1
-
Side Adaptor Panel
1
-
Outdoor Air Hood (Attached to Economizer)
1
-
Hardware Package
1
-
Wiring Diagram Sticker
1
-
Mixed Air Sensor (MAS)
2
-
29" Extension Wires for Mixed Air Sensor
3
-
6" Wire Tie
3
-
#10 x 16 x ½" Self-Tapping Screws
10 -
#10 x 16 x ½" Type A Screws
1
-
.875 Bushing Shutter
SIDE PANEL
UPPER PANEL 1
INSTALLATION
INSTRUCTION
DOWNFLOW ECONOMIZER # 558870
PACKAGE EQUIPMENT MODELS
*R6G(D,F) 024*–060* / *R8GD 036*-060*
*P6SD 024*-060* / *Q6SD 024*-060*
Note:
Reference Unit Technical Service Literature for application requirements.
HARDWARE PACKAGE
Note: For rooftop or other installations that requires the
economizer to be lifted or hoisted, always lift
economizer with the supplied packaging in place to
prevent damage from lifting and rigging equipment.
1
Ship ping In for ma tion
Height
Length
Width
Weight
35"
57 ½"
20 ½"
118
FORM# 136D-0312 (Replaces 136D-1008)
UPPER PANEL 2
UPPER PANEL 3