Installation instruction – Reznor R6GF Option - Installation - Economizer - Light Commercial User Manual

Page 2

Advertising
background image

Step 1:
Inspect economizer for shipping damage and correct parts with
list below.

1

-

Economizer Assembly w/ Filter installed

3

-

Upper Adaptor Panels

1

-

Side Adaptor Panel

1

-

Outdoor Air Hood (Attached to Economizer)

1

-

Hardware Package
1

-

Wiring Diagram Sticker

1

-

Mixed Air Sensor (MAS)

2

-

29" Extension Wires for Mixed Air Sensor

3

-

6" Wire Tie

3

-

#10 x 16 x ½" Self-Tapping Screws

10 -

#10 x 16 x ½" Type A Screws

1

-

.875 Bushing Shutter

SIDE PANEL

UPPER PANEL 1

INSTALLATION

INSTRUCTION

DOWNFLOW ECONOMIZER # 558870

PACKAGE EQUIPMENT MODELS

*R6G(D,F) 024*–060* / *R8GD 036*-060*

*P6SD 024*-060* / *Q6SD 024*-060*

Note:
Reference Unit Technical Service Literature for application requirements.

HARDWARE PACKAGE

Note: For rooftop or other installations that requires the

economizer to be lifted or hoisted, always lift
economizer with the supplied packaging in place to
prevent damage from lifting and rigging equipment.

1

Ship ping In for ma tion

Height

Length

Width

Weight

35"

57 ½"

20 ½"

118

FORM# 136D-0312 (Replaces 136D-1008)

UPPER PANEL 2

UPPER PANEL 3

Advertising