2 5824 sbus connections, 2 5824 sbus connections -26 – SilentKnight SK-5208 Conventional FACP 10-30 Zone User Manual

Page 36

Advertising
background image

Control Panel Installation 151204

3-26

2.

Remove the 5824 circuit board from the base by pushing outward on the base snap retaining tabs and lifting
the circuit board out.

Figure 1: 5824 Circuit Board And Plastic Base

3.

Mount the plastic base.

4.

Replace the circuit board in the plastic base.

Note: It may be necessary to connect the wiring to the circuit board before the board is replaced in the base. See

Section 3.14.5.2.

5.

Connect the 5824 to the 5208.

6.

Set the device ID (see Section 3.14.1). See also Figure 3-25 for ID selector switch location.

3.14.5.2 5824 SBUS Connections

Figure 3-24 illustrates how the 5824 connects to the 5208 control panel.

Figure 3-24 5824 Connections

Snap

Base

Retaining Tabs

Mounting Holes

Mounting Holes

Supervised
Power Limited

5824

Control

Panel

Advertising