Beam clamp bracket j-bolt – Tie Down Concrete Foundation System User Manual

Page 2

Advertising
background image

Xi2 Lateral Stabilization with Concrete Footers

Installation of Concrete Bracket: Dry Set/Wet Set

1. Identify the number of systems to be used on the home using the

chart provided.

2. Identify the location where the lateral systems will be installed. If installing

lateral and longitudinal together, check page 4 for alignment of bracket.

3. Build pier according to State, Local or Home Manufacturers guidelines.
4a. For dry set: drill two 3/8”x 3” deep holes in the concrete using holes in

galvanized bracket as a guide. Attach bracket to concrete pad using

3/8”x 3-1/2” wedge anchors provided. Place nut & washer on anchor, leave

enough room for 1 to 2 threads showing on top of bolt. Using a hammer,

tap the wedge bolts into hole through bracket, leaving nut & washer flush

with bracket. Using a 9/16” socket wrench, tighten wedge/anchor bolt,

securing bracket to the concrete.

4b. For wet set: align bracket and submerge legs completely in concrete.

Bottom of bracket should rest on surface.

5. Attach the end of the smaller tube to the bracket mounted on the pad, using the

grade 5, 1/2” x 2-1/2” bolt/nut provided.

6. Attach the flag end of the larger tube to the opposite I-beam using the

“J” bolt over the top of the I-beam with the nut & washer provided.

(Figure 1 on last page)

7. Install a minimum of four (#14 x 1” Tek screws) self-tapping screws into

the holes provided in the lateral strut so that the two tubes are connected

together with a minimum overlap of 4” to 6” (Figure 2 on last page).

End of Home

End of Home

I-Beam

Lateral

Longitudinal

Beam Clamp

Bracket

J-Bolt

Nut & Washer

1-1/2" Tube

Lateral Struts

1-3/4" Tube

4 - 1#12 x 1"

Tek Screws

Lateral

I-Beam

Minimum distance from

edge: 1-1/2”, stamped

part #59264

Single Section Home
0 - 76’ Box

2 Xi2 Systems

Over 76’ Box 3 Xi2 Systems

Single Section Home
0 - 64’ Box

2 Xi2 Systems

Over 64’ Box 3 Xi2 Systems

Double Section Home
0 - 76’ Box

2 Xi2 Systems

Over 76’ Box 3 Xi2 Systems

Double Section Home
0 - 64’ Box

2 Xi2 Systems

Over 64’ Box 3 Xi2 Systems

Triple Section Home
0 - 76’ Box

2 Xi2 Systems

Over 76’ Box 3 Xi2 Systems

Triple Section Home
0 - 64’ Box

2 Xi2 Systems

Over 64’ Box 3 Xi2 Systems

Xi

System

24'

28'

32'

32' 49' 65' 82' --

30' 46' 62' 76' 80'

-- 44' 58' 73' 80'

2

3

4

5

6

wide

wide

wide

(1)

(1)

(1)

Xi2 Pier

Placement

Xi

System

24'

28'

32'

32' 49' 65' 82' --

30' 46' 62' 76' 80'

-- 44' 58' 73' 80'

2

3

4

5

6

wide

wide

wide

(1)

(1)

(1)

3rd System

for Placement

* For Wind Zone I - Approved anchor w/strap from 45 to 90 degrees, within 10’ of end of home on single sections.

NOTE: Diagram represents single section up to 16’ width, double section up to 32’ width, and triple section homes up to 48’ width.

Approved Anchor*

with strap from

45 to 90 degrees

Wind Zones

I & II

Wind Zones

III

See “Footer Requirement”

on page 1 for edge

placement

Advertising