Strut, Strut angles – Tie Down Concrete Foundation System User Manual

Page 4

Advertising
background image

Beam Clamp

Bracket

J-Bolt

Nut & Washer

1-1/2" Tube

Lateral Struts

1-3/4" Tube

4 - #14 x 1”

Tek Screws

2 per side

Lateral

Stabilization

(either side)

Wind Zone I

Lateral &

One Longitudinal

System

Wind Zone II & III

One additional

Longitudinal

System

I-Beam

Lateral Stabilization

I-Beam

Position A

(either side)

Position B

3/4"

17/32"

from end

Strut

Strut Angles:

Need to be no more than
50 degrees and not less than
25 degrees. If needed, tube
can be cut to proper length
and a new hole drilled
according to chart on below.

Xi2 Concrete System

Part #59307

Includes: Strut #48609 &

Hardware kit #59327.

Longer struts are available

Figure 2

Figure 3

Figure 4

Figure 1

Xi2 Lateral Foundation System

Xi2 Longitudinal Installations

www.tiedown.com

(404) 344-0000

©2013 Tie Down, Inc.

All Rights Reserved

Advertising