Strut, Strut angles – Tie Down Concrete Foundation System User Manual
Page 4
Beam Clamp
Bracket
J-Bolt
Nut & Washer
1-1/2" Tube
Lateral Struts
1-3/4" Tube
4 - #14 x 1”
Tek Screws
2 per side
Lateral
Stabilization
(either side)
Wind Zone I
Lateral &
One Longitudinal
System
Wind Zone II & III
One additional
Longitudinal
System
I-Beam
Lateral Stabilization
I-Beam
Position A
(either side)
Position B
3/4"
17/32"
from end
Strut
Strut Angles:
Need to be no more than
50 degrees and not less than
25 degrees. If needed, tube
can be cut to proper length
and a new hole drilled
according to chart on below.
Xi2 Concrete System
Part #59307
Includes: Strut #48609 &
Hardware kit #59327.
Longer struts are available
Figure 2
Figure 3
Figure 4
Figure 1
Xi2 Lateral Foundation System
Xi2 Longitudinal Installations
www.tiedown.com
(404) 344-0000
©2013 Tie Down, Inc.
All Rights Reserved