Re (see, Figure 3-5 – Cisco 3750 User Manual

Page 46

Advertising
background image

3-6

Catalyst 3750 Metro Switch Hardware Installation Guide

OL-9160-02

Chapter 3 Connecting the Power Supply

Connecting to DC Power

Figure 3-5

Crimping the Ground Lug

Step 5

Use the two number-10-32 screws to attach the ground lug and wire assembly to the rear panel of the
switch.

Step 6

Using a ratcheting torque screwdriver, torque each grounding-lug screw to 15 lbf-in. (240 ounce-force
inches [ozf-in.]).

Figure 3-6

shows how to torque the grounding-lug screws on a switch.

Figure 3-6

Torquing Ground-Lug Screws

60529

1

Grounding-lug screws

STACK 1

STACK 1

97470

1

Advertising