Installation guide, Step 24, Step 25 – Trending Accessibility Adjustable fusion shower pan surface mounted on concrete User Manual

Page 10: Step 26

Advertising
background image

Installation Guide

www.trendingaccessibility.com

[email protected]

10

for adjustable fusion shower pan surface mounted on concrete

Step 25

The height adjustment ring and floor drain bowl

must now be fixed together using solvent cement.

Because solvent cements sets very rapidly we

strongly recommend the adjustment is done “dry”

first.

To set the permanent height of the grate frame,

place a floor tile beside the frame. Rotate the frame

until the height is about 1/16” higher (this accounts

for adhesive thickness). Now mark the position

of the adjustment ring. This mark shows the

final height position. Remove ring, apply solvent

cement, and re-align components to your marked

position. It is best to hold securely until pieces are

fully bonded.

Step 24

In order to set the correct height of the grate frame,

you may need to use the height extension ring

(see diagram to the right). If the height extension

ring is required, it will need to be fixed to the height

adjustment ring using solvent cement. The grate

frame can now be attached to the height adjustment

or extension ring, depending on tile thickness. This is

done by using firm pressure to clip the components

together; it is a tight fit.

“click”

extention ring

adjusting ring

1/4” to 5/8” Tile Height

5/8” - 1” Tile Height

grate frame

grate frame

adjusting ring

Step 26

You are now ready to tile. If you are using large

format tiles, they must be cut diagonally and laid to

follow the pitch in the Adjustable Fusion Pan (From

the corners of the grate frame to the corners of the

Fusion Pan). Apply the tile adhesive, and lay the

tiles in a regular pattern.

Advertising