Installation guide, Step 19, Step 18 – Trending Accessibility Adjustable fusion shower pan surface mounted on concrete User Manual

Page 8: Step 17, Step 20

Advertising
background image

Installation Guide

www.trendingaccessibility.com

[email protected]

8

for adjustable fusion shower pan surface mounted on concrete

Step 18

Just like you applied the corner pieces, use your

cut strips of Crack Insulation Tape to cover all the

seams. Again, trowel or paint liquid waterproofing

onto seam, press tape into position and coat

the top to seal. Make sure to fully cover both

sides of the crack isolation tape with the liquid

waterproofing product. To make this process more

manageable, it is best to work in two foot sections.

NOTE:

Illustration just shows tape use.

Please apply liquid waterproof-

ing to the wall and tape before

applying.

Extend the tape

2 feet past the

shower pan

2 feet

Step 17

Using the 5” crack isolation tape provided, cut

strips of tape to length, to cover all seams (Corner

seams, wall/floor seams, pan/floor joint). Put

pieces aside.

If you are creating full wet room, you will need to tape

any seams throughout the entire room.

If you are only waterproofing the shower zone, you

will only need to tape the seams up to 2 feet outside

the shower area.

Step 19

Using the 5” crack isolation tape. Overlap all seams

on either the floors or walls. Overlap the seam where

the Adjustable Fusion pan and concrete meet.

Make sure the tape

overlaps the seams

equally.

Step 20

Using the provided precut piece of gasket

membrane, slather area where gasket piece

will adhered to the drain area. Place over drain

adapter flange, making sure to cover all screw

holes, and securely press down into flange. Coat

top of gasket piece with liquid waterproofing.

Important: Remember to remove the clamping

ring prior to placing drain gasket.

Gasket Clamp

Drain Adapter Flange

Gasket

Membrane

Advertising