Assembly instructions – Vogelzang TR002 User Manual

Page 5

Advertising
background image

VGZ-027 / 20120209.1

TR002 SHILOH™ / Page 5

ASSEMBLY INSTRUCTIONS

TOOLS AND MATERIALS REQUIRED

FOR INSTALLATION

tools

• Pencil
• 6 foot Folding Rule or Tape Measure
• Tin Snips
• Drill: Hand or Electric
• 1/8” dia. Drill Bit (for sheet metal screws)
• Screwdrivers (blade and Phillips type)
• 5/16 inch Nut Driver or Ratchet with 5/16 inch Socket
• Safety Glasses
• Gloves

materials

(NOTE: The following items are NOT included with your stove)

Flooring Protection: 36” x 48” as specified (see page 7)
Chimney Connector Pipe: 6” dia. minimum 24 MSG black or 26

MSG blue steel straight stove pipe or elbow(s) as required.

1/2” Sheet Metal Screws
Chimney: Existing 6” Code-approved Lined Masonry Chimney or

6” Inside Dia. Listed Type HT manufactured chimney.

Furnace Cement (manufacturer recommends Rutland Code 78

or equivalent)

CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.

1. Uncrate the stove and remove all cardboard and

styrofoam packing materials and protective poly
bag. Remove pedestal base, sides, front, top, ash-
drawer and ash drawer support from the carton.
(Save packing materials for further assembly.)

NOTICE: DO NOT remove ceramic blanket material
from inside stove pipe opening (Fig. 1).

4. Attach the pedestal front frame to the sides. The

pedestal front should go

over (not inside of) the side

panels. Use three (3) self-tapping screws (provided
in the hardware pack) on each side to attach both
pedestal sides (#15) to the pedestal front (#17).

5. Position ash drawer support into assembled ped-

estal (Figure 5) and secure from rear with two (2)
machine screws, lockwashers and hex nuts. Tighten
all pedestal hardware.

2. Remove parts and hardware pack located inside

firebox.

Figure 2 – Pedestal

Assembly Hardware

sheet metal screws, 5/16˝

machine screw, lock

washer & hex nuts

Figure 3 –

Assemble

sides to base

Figure 4 – Attach Pedestal

Front Frame to Sides.

(Note– front goes OVER

the side panels.)

Figure 1 – DO NOT remove ceramic blanket from

inside stove pipe opening. This is NOT packing

material but an integral component of the stove

combustion system.

NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or

maintenance of your wood stove and assumes no responsibility of any incidental or consequential damages.

3. Align the hole pattern of one of the pedestal sides

to the holes in the base and secure with four (4)
machine screws, lock washers and hex nuts. As-
semble the opposite side to the base. (Note: Sides
are interchangable)

continued on next page

Advertising