Assembly instructions . . . continued – Vogelzang TR002 User Manual

Page 6

Advertising
background image

Page 6 / TR002 SHILOH™

VGZ-027 / 20120209.1

6. Position the pedestal top with the large vent hole

positioned toward the front and attach with six (6)
machine screws, lock washers and hex nuts. (See
Figure 6)

7. Place flattened carton/styrofoam packing material

on floor and carefully tip the stove body onto it’s
back.

Figure 6 – Attach Pedestal Top.

(Note– Position vent orfice towards front.)

Figure 5 – Insert Ash Drawer Support.

8. Align four (4) corner mounting studs with holes in

pedestal top (Figure 7). Secure with four (4) hex
nuts.

9. Tip the stove assembly upright.
10. Set the ash drawer inside the open box formed by

the pedestal front and sides.

Figure 7 – Attach Pedestal to Stove Body

11. For Optional Blower Assembly, note the position of

the blower opening in the rear of the stove.

12. Place blower gasket onto blower assembly so as

not to obstruct the air flow from the fan.

Figure 8

Blower Option

13. Mount the blower assembly to the back of the stove

aligning the fan opening to the opening in the back
of the stove. Secure with four sheet metal screws.

14. After assembly, check to make sure fire brick are

properly positioned and ash cleanout cover is in
place.

Figure 9 – Attach Optional Blower to Stove Body

ASSEMBLY INSTRUCTIONS . . . continued

Advertising