Winco ULPSS8B4W/E User Manual

Page 14

Advertising
background image

045-00

4

60706-20

** NOTICE **

If for any reason during the check out procedures

the voltage and frequency are not correct, move the

toggle switch to the “STOP” position and correct the

trouble before proceeding.

After verifying the voltage and frequency are cor-

rect, move the right hand toggle switch to the AUTO

position. The unit should shut off with no time delay.

The right hand toggle switch must be left in the

AUTO position for proper operation of the gen-

erator. If you leave it in the RUN position the fuel

solenoid will remain open and it will not shutdown

properly after the next exercise period.

Transfer Switch & Engine Generator

This procedure checks the electrical operation of

the automatic transfer switch. If the actual operation

does not follow this procedure, consult the trou-

blshooting section in the transfer switch manual.

. Move the left hand toggle switch from the OFF

position to the ON position. The alarm light should

go out. The unit is now ready to be operated from

the Automatic Transfer Switch.

******************

***** WARNING *****

******************

PERSONAL INJURY HAZARD - Install front cover

in transfer switch before operation. An electrical sys-

tem fault could cause a flash and severe personal

injury.

2. Turn on the preferred source (utility) circuit

breaker. The utility source acceptable light should

now come on as well as the transfer switch on utility

light. If these lights fail to come on recheck your

incoming power to insure you have 240 volts nomi-

nal. If not, troubleshoot your utility source before

continuing.

3. Turn on the altenate source (generator) curcuit

breaker.

4. Press and hold the

Push to Test button until

the generator (alternate source) acceptable light

comes on and stays on. Then release the button.

This will start up your generator set.

This light indicates that the generator is running and

the output voltage and frequency are within accept-

able limits. Under normal conditions this light should

come on in 5 to 0 seconds. If the light does not

come on and stay on a malfunction has occurred.

Either the unit didn’t start or the voltage or frequency

is incorrect. Correct the problem before continuing.

5. About 5 seconds after the generator (alter-

nate source) acceptable light comes on, the auto-

matic transfer switch should transfer the load from

the utility to the generator. At that time the

Transfer

Switch on generator light should come on.

6. The generator will stay connected to the load

for about 5 minutes at which time the transfer switch

will transfer the load back to the utility. At the time it

transfers back to utility the Transfer Switch on Utility

light should come on and the Transfer Switch on

generator light should go out. To bypass this five

minute time delay you can press and release the

Push to Test button again at any time.

7. After the load retransfer to the utility, the gen-

erator will continue to run for about  minute (without

a load) and then shut down. The Generator accept-

able light will go off indicating the generator set has

shut down. This completes the functional test of the

transfer switch and the generator set. If you want to

leave the generator in the Automatic Start mode you

can leave the left hand toggle switch on the genera-

tor in the ON position. If you have additional work to

do or don’t want to leave the engine generator set in

the automatic position start mode move the toggle

switch to the OFF position. In the OFF postion the

alarm light will come on and the engine generator

set will not start or run.

GENERATOR EXERCISER CIRCUIT

The automatic generator exerciser is configured to

automatically exercise the generator for 20 minutes

once every 4 days.

Advertising