Index – Winco ASCO 300 G Design 1000-3000 Amp User Manual
Page 19
![background image](/manuals/716171/19/background.png)
INDEX
Printed in U.S.A.
E
2005 ASCO Power Technologies, L.P.
A
accessories, 5–2, 5–3, 5–4, 5–5
auxiliary circuits, 1–2
B
barriers, 1–3
battery, 4–2, 5–1
buttons, push, 3–1
bypass time delay, 1–4, 2–1, 3–1
C
cable
lugs, 1–1
preparation, 1–1
spacers, 1–1
illustration of, 1–1
catalog number, inside cover
cleaning, 3–1
connections
engine control contact, 1–2
line, 1–1
contact position indicators, 1–3
contacts
auxiliary, 1–2
engine control, 1–2
main, 3–1
source availability, 5–2
control features, 5–1
load disconnect, 5–5
motor load transfer, 5–5
plant exerciser, 5–1, 5–2, 5–3, 5–4
controller (control panel), 4–1, 4–2
codes, cover
cover removal, 4–2
disconnecting, 3–1
time delay potentiometers, 4–2
D
DIP Switches, 4–1, 4–2, 5–1, 5–2, 5–5
E
electrical operation, 1–4
engine exerciser, 5–1, 5–2, 5–3, 5–4
engine starting contacts, 1–2
F
features, see control features
frequency, pickup and dropout
settings, 4–1
functiona testl, 1–3, 1–4, 1–5
H
harness, 1–2
disconnect plugs, 3–1
help, service 3–2
I
inphase monitor, 5–5
inspection, 3–1
installation, 1–1
insulator backing piece, 1–1
illustration of, 1–1
warning, 1–1
L
labels,
engine starting contacts, 1–2
inputs / outputs, 1–2
rating, cover
lights, 1–4, 1–5, 5–1
load disconnect feature, 5–4
lubrication, 3–1
M
maintenance, preventive, 3–1
manual load transfer, 3–2
warning, 3–2
manual operation, 1–3
illustration & warning, 1–3
motor load transfer feature, 5–5
N
nameplate, cover
O
operation
electrical, 1–4
manual, 1–3
illustration & warning, 1–3
sequence of, 2–1
P
parts, 3–1
problem, 3–2
programmable engine exerciser, 5–2,
5–3, 5–4
R
rating label, inside cover
remote control features, 5–5
bypass transfer time delay, 5–5
inhibit transfer to emergency, 5–5
remote test, 5–5
remote transfer to emergency, 5–5
replacement parts, 3–1
S
service, call 800–800–2726 (ASCO)
set engine exerciser, 5–1, 5–2, 5–3,
5–4
settings
changing, 4–1
factory, 4–1
frequency, 4–1
phase, 4–1
time delay, 4–1
voltage, 4–1
T
terminal block, 1–2
test, functional, 1–3, 1–4, 1–5
time delay
adjustment, 4–1
gen–set cooldown, 4–1
how to change, 4–2
override momentary outages, 4–1
settings, 4–1
transfer to emergency, 4–1
transfer to normal, 4–1
timer (plant exerciser), how to set,
5–1, 5–2, 5–3, 5–4
transfer switch test, 1–4, 3–1
trouble–shooting, 3–2
inphase monitor, 5–4
V
voltage, phase, 4–1
voltage, pickup and dropout settings,
4–1