INSTALLATION

(continued)

1--4

Press until light

FLASHES

Press for 15 Seconds

Florham Park NJ 07932 USA

TRANSFER SWITCH TEST

BYPASS TIME DELAY

SET ENGINE EXERCISER

observe these lights

Figure 1–5. Standard controls and indicators.

2 – Voltage Checks

First check nameplate on transfer switch; rated voltage

must be the same as normal and emergency line voltages.

Verify that the feeders have been

connected to the proper lugs.

!

Use extreme caution when using a meter

to measure voltages in the following

steps. Do not touch power terminals;

shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status

lights. See Figure 1–5.

Black circle means light is on.

White circle means light is off.

* If necessary, adjust voltage regulator on the generator
according to the manufacturer’s recommendations. The

Automatic Transfer Switch will respond only to the rated

voltage specified on the Transfer Switch nameplate.

1

Close the normal source circuit

breaker. The

Transfer Switch

Connected To Normal and the

Normal Source Available lights

should come on.

2

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch normal

source terminals.

3

Close the emergency source

circuit breaker. (Start generator,

if necessary.) The

Transfer

Switch Connected To Normal

and the

Emergency Source

Available lights should come on.

4

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch emer-

gency source terminals.*

5

Use a phase rotation meter to

check phase rotation of emer-

gency source; it must be the

same as the normal source.

A B C

6

Shut down the engine–genera-

tor, if applicable. The

Emergen-

cy Source Accepted light should

go off. Then put the starting

control selector switch (on the

generator set) in the

automatic

position. Close enclosure door.

Now continue to 3 – Electrical Operation on next page.