Installation – Winco ASCO 300 H Design 600-1200 Amp User Manual

Page 8

Advertising
background image

INSTALLATION

(continued)

1---4

observe these lights

Figure 1–5. St andard controls and indicators.

2 – Voltage Checks

First check nameplate on transfer switch; rated voltage
must be the same as normal and emergency line voltages.

Verify that the feeders have been

connected to the proper lugs.

!

Use extreme caution when using a meter

to measure voltages in the following

steps. Do not touch power terminals;

shock, burns, or death could result !

Perform steps 1 through 6 at the right. Observe the status
lights. See Figure 1–5.

● Black circle means light is on.
❍ White circle means light is off.

* If necessary, adjust voltage regulator on the generator
according to the manufacturer’s recommendations. The
Automatic Transfer Switch will respond only to the rated
voltage specified on the Transfer Switch nameplate.

1

Close the normal source circuit

breaker. The Normal Transfer

Switch Position and the Normal

Source Accepted lights should

come on.

Source Accepted

Normal

Emergency

2

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch normal

source terminals.

3

Close the emergency source

circuit breaker. (Start generator,

if necessary.) The Emergency

Source Accepted light should

come on.

Source Accepted

Normal

Emergency

4

Use an accurate voltmeter to

check phase to phase and

phase to neutral voltages pres-

ent at the transfer switch emer-

gency source terminals.*

5

Use a phase rotation meter to

check phase rotation of emer-

gency source; it must be the

same as the normal source.

A B C

6

Shut down the engine–genera-

tor, if applicable. The Emergen-

cy Source Accepted light should

go off. Then put the starting

control selector switch (on the

generator set) in the automatic

position. Close enclosure door.

Source Accepted

Normal

Emergency

Now continue to 3 – Electrical Operation on next page.

Advertising