INSTALLATION

(continued)

1---5

press this button

observe these lights

Figure 1–6. Standard controls and indicators.

3 – Electrical Operation

First check nameplate on transfer switch; rated voltage
must be the same as normal and emergency line voltages.

Verify that the feeders have been

connected to the proper lugs.

!

Use extreme caution when using a meter

to measure voltages in the following

steps. Do not touch power terminals;

shock, burns, or death could result !

Perform steps 1 through 8 at the right. Observe the status
lights. See Figure 1–6.

● Black circle means light is on.
❍ White circle means light is off.

NOTE:

If Motor Load Transfer feature

is activated, then transfer may not occur
immediately after the respective time
delays. Transfer will only occur when
the phase relationship between sources
is correct.

This completes the Functional Test of the ASCO Series 300
Automatic Transfer Switch. Leave the engine–generator
starting control in the automatic position.

1

The normal source must be

available and the generator

must be ready to start.

Check that the Normal Source

Accepted light is on.

Source Accepted

Normal

Emergency

2

Press and hold the Transfer Test

button until the engine starts

and runs. This should happen

within 15 sec.

Transfer

Test

3 The Emergency Source

Accepted light should come on.

Source Accepted

Normal

Emergency

4

The transfer switch should

transfer to the Emergency

position. The Emergency

Transfer Switch Position light

should come on and the Normal

light should go off.

Transfer Switch

Position

Normal

Emergency

5

If the transfer to emergency

delay is used the transfer

should occurs after a time delay

(up to 5 minutes).

For immediate transfer press

the Bypass Time Delay button.

Bypass

Time Delay

6

The transfer switch should

transfer back to the Normal

position. The Normal Transfer

Switch Position light should

come on and the Emergency

light should go off.

Transfer Switch

Position

Normal

Emergency

7

If the retransfer to normal delay

is used the retransfer should

occur after a time delay

(up to 30 minutes).

For immediate retransfer press

the Bypass Time Delay button.

Bypass

Time Delay

8

The unloaded running delay

keeps the generator running for

5 minutes (cool–down period).

Then the generator should stop

and the Emergency Source

Accepted light should go off.

Source Accepted

Normal

Emergency