Carrier HERMETIC SCREW LIQUID CHILLERS 23 XL User Manual

Page 35

Advertising
background image

INSTALLATION START-UP REQUEST CHECKLIST

Machine Model Number: 23XL

Serial Number:

To:

Attn:

Date

Project Name

Carrier Job Number

The following information provides the status of the chiller installation.

YES/NO

(N/A)

DATE TO BE

COMPLETED

1. The machine is level.

2. The machine components are installed and connected in

accordance with the installation instructions.

3. The isolation package and grouting (if necessary)

are installed.

4. The relief valves are piped to the atmosphere.

5. All piping is installed and supported. Direction of flow

is indicated in accordance with the installation instructions
and job prints.

a. Chilled water piping

b. Condenser water piping

c. Waterbox drain piping

d. Pumpout unit condenser piping (if installed)

e. Other

6. Gages are installed as called for on the job prints required

to establish design flow for the cooler and condenser.

a. Water pressure gages IN and OUT

b. Water temperature gages IN and OUT

7. The machine’s starter wiring is complete. The wiring is

installed per installation instructions and certified prints.

a. Power wiring to compressor motor. (Motor leads will

not be taped until the Carrier technician megger tests
the motor.)

b. Oil heater/control wiring (if applicable)

c. Other

8. The motor starter has not been supplied by Carrier. It

has been installed according to the manufacturer’s
instructions.

9. The motor starter has not been supplied by Carrier and it

has been checked for proper operation.

COMMENTS:

CUT

ALONG

DOTTED

LINE

----------------------------------------------------------------------------------------

CL-1

Advertising