Carrier 09DK054-084 User Manual

Installation, start-up and service instructions, Air-cooled packages

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

HEATING & COOLING

09DK054-084

Air-Cooled Condenser Units

50/60 Hz

à

Installation, Start-Up and

Service Instructions

Air-Cooled Packages

CONTENTS

SAFETY CONSIDERATIONS ...

Page

,.. 1

1-28

INSTALLATION .................................................
Step 1 — Complete Pre-Installation

Checks ............................................................................. 1

Step 2 — Rig and Place Unit ..........................................4
• RIGGING
• PLACING THE UNIT
Step 3 — Complete Refrigerant Piping..................... 7
• GENERAL
• COIL REFRIGERANT PIPING INSTALLATION
• TUBING PACKAGE INSTALLATION
• THREE AND FOUR COIL SPLIT, COIL

CIRCUITING APPLICATIONS; 054-084 UNITS

• REFRIGERANT LINE SIZING
• LIQUID SHUTOFF VALVE AND SIGHT GLASS
• PRESSURE RELIEF
• REFRIGERANT RECEIVER
• LIQUID LIFT
Step 4 — Complete Electrical

Connections..................................................................21

• GENERAL
• FIELD CQNNECTIONS
• MAIN POWER WIRING
• CONTROL CIRCUIT POWER WIRING
• GENERAL WIRING NOTES
• DESCRIPTION OF CONTROLS
Step 5 — Add Accessories as Needed .....................28

START-UP.......................................................................... 29
System Evacuation and

Dehydration ..................................................................29

Charging Procedure........................................................29
Check Operation of Condenser Fan Motor

Controls and Rotation of Fans................................ 29

SERVICE ...................................................................... 29-31
Cleaning Condenser Coils ........................................ 29.
Condenser Fans ..............................................................29
Lubrication ....................................................................... 29
Head Pressure Control ..................................................29
• FAN CYCLING

SAFETY COIVISIDERATIOIMS

Installing, starting up, and servicing air-conditioning equip­

ment can be hazardous due to system pressures, electrical
components, and equipment location (roofs, elevated struc­
tures, etc.).

Only trained, qualified installers and service mechanics

should install, start up, and service this equipment (Fig. 1).

Untrained personnel can perform basic maintenance func­

tions such as cleaning coils. All other operations should be
performed by trained service personnel.

Fig. 1 — Model 09DK (084 Shown)

When working on the equipment, observe precautions in

the literature and on tags, stickers, and labels attached to
the equipment.

Follow all safety codes. Wear safety glasses and work

gloves. Keep quenching cloth and fire extinguisher nearby
when brazing. Use care in handling, rigging and setting bulky
equipment.

See Tables lA and IB for Physical Data.

ELECTRIC SHOCK HAZARD
Separate power sources (main and control cir­
cuit power) are used for these units. Be sure
both main and control circuit powers are dis­
connected before servicing.

INSTALLATION

Step 1 — Complete Pre-Installation Checks —

Examine for damage incurred during shipment. File claim
immediately with transit company if damage is found. Ver­
ify that the nameplate electrical requirements match the avail­
able power supply. Check the shipment for completeness.

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Book 12

PC 111

Catalog No 530-953

Printed in U.S A

Form 09DK-4SI

Pg 1

4-93

Replaces: New

Tab 4a

Advertising