Carrier 38JB User Manual

Centrifugal fan condensing unit

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Number One

AirConditbning

Maker

^^2 Division of

Cattiet Corporation

Carrier Parkway • Syracuse NY 53221

Centrifugal Fan Condensing Unit

INDEX

Page

SAFETY CONSIDERATIONS......................... 1
INSTAELATION................................................1

Step 1 — Check Equipment and Jobsite ... 1

• UNPACKAGE UNIT.................................... 1
• INSPECT EQUIPMENT...............................2
• COMPLETE OR CONSIDER SYSTEM

REQUIREMENTS......................................... 2

Step 2 — Unit Support........................................ 2

• FLOORS AND FLOOR JOISTS..................2

• TO SUSPEND UNIT...................................... 2

Step

3

— Make Ductwork Connections ... 2

• CONNECT SUPPLY AIR

DUCTWORK................................................. 2

Step 4 — Provide for Unit Condensate

Disposal...............................................3

• BASEPAN DRAIN ........................................ 3

Step

5

— Make Electrical Connections . . . . 3

• BRING LINE POWER LEADS

INTO UNIT.................................................... 3

• CONNECTCONTROL POWER

WIRING..........................................................3

Step 6 — Make Piping Connections.................. 4

• CONNECT REFRIGERANT LINES........... 4

START-UP...........................................................5

SERVICE ............................................................ 6

SAFETY CONSIDERATIONS

Installation and servicing of air conditioning

equipment can be hazardous due to system pressure

and electrical components. Only trained and quali­

fied service personnel should install, repair or

service air conditioning equipment.

Untrained personnel can perform basic mainten­

ance functions of cleaning coils and filters and

replacing filters. All other operations should be

performed by trained service personnel. When
working on air conditioning equipment, observe
precautions in the literature, tags and labels

attached to the unit and other safety precautions
that may apply.

Follow all safety codes. Wear safety glasses and

work gloves. Use quenching cloth for unbrazing
operations.

INSTALLATION

General

— Install the 38JB condensate unit indoors.

Provide access for cleaning and servicing as shown in
Fig. 1. Use field-supplied condenser air filters fpr

proper unit operation.

Step 1 — Check Equipment and Jobsite

UNPACKAGE UNIT — Move to final location.
Use care as unit is heavy and awkward to handle.

Carefully remove from carton so as not to damage
unit.

)■

Table 1 — Physical Data

UNIT38JB

016

024

OPERATING WEIGHT (lb)

1060

1370

REFRIGERANT

R-22

Charge (lb)

13

9*

COMPRESSOR(S)

Recip Hermeticf

Oil, PP33-2 (pt). See Note

10

10 (ea)

CONDENSER AIR FANS

Centrifugal, Belt Drive

Motor, Hp...Rpm

5 1750

Motor Frame (NEMA)

213T

Motor Pulley Pitch Diameter

R R-fi R

Range (in.)

Fan Pulley Pitch Diameter (in )

7 8

Belt; No —Designation

1-B57

Belt Pitch Length (in )

57

Fan Factory Setting (Rpm)

1370

Fan Range (Rpm)

1220-1460

Max Allowable Fan Speed (Rpm)

1600t

Speed change per 1/2 turn of

movable motor pulley flange

Movable pulley factory setting

1-1 /9

full turns open

Max allowable full turns from

A

closed position

PRESSURESTAT

Factory Settings; psig

High Cutout

375 ± 5

428 ± 4

Low Cutout

29 ± 5

29 ± 2

Low Cut-in

39 ± 3

39 ± 3

‘Each system

tone on 016; 2 on 024
tNot attainable with factory-supplied pulley

NOTE Approved vendors and designations —

Sun Oil Company

Texaco, Inc ..

.

. . . .

Suniso 3GS

Capella Bl

E I DuPont Company

DuPont Synthetic Refrigeration Oil

© Carrier Corporation 1980

Form 38JB-3SI

Advertising