Cable assembly – Sears 831.15403 User Manual

Page 13

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Cable Assembly

22.

Refer to the CABLE DIAGRAMS on pages 27

and 28 as you assemble the cables and to

identify the cables.

Locate the Lat Cable (71).

Route the Cable up

through the Right Top Frame (7) and over a

90mm Pulley (39).

Make sure the Cable is

between the Pulley and the rod in the Top

Frame.

Attach the Pulley inside the Top Frame

with an M10 X 80mm Bolt (111), two M10
Washers (116), two 19mm Spacers (77), and an
M10 Nylon Locknut (114).

23. Route the Lat Cable (71) over a 90mm Pulley

(39) and down through the Right Top Frame (7).

Make sure the Cable is between the Pulley

and the rod in the Top Frame.

Attach the Pulley

inside the Top Frame with an M10 x 80mm Bolt
(111), two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut (114).

24. Wrap the Lat Cable (71) under a 90mm Pulley

(39). Attach the Pulley, a Small Cable Trap (48),

and two Half Finger Guards (42) at the second

hole from the top of the two Pulley Plates (51)

with an M10

X

52mm Bolt (102) and an M10

Nylon Locknut (114).

Make sure the Cable Trap

and Finger Guards are oriented as shown.

25. Route the Lat Cable (71) up through the Right

Top Frame (7) and over a 90mm Pulley (39).

Make sure the Cable is between the Pulley

and the rod in the Top Frame.

Attach the Pulley

inside the Top Frame with an M10 x 80mm Bolt
(111), two M10 Washers (116), two 19mm
Spacers (77), and an M10 Nylon Locknut (114).

26. Wrap the Lat Cable (71) around a 115mm Pulley

(41). Attach the Pulley and a Large Cable Trap

(125) to the Right Top Frame (7) with an M10 x

110mm Bolt (73) and an M10 Nylon Locknut

(114).

13

Advertising