Install leveling legs – Maytag MED5591TQ1 User Manual

Page 17

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Vent system chart - 0 ft {0 m) to 10 ft (3.0 m)

No. of

turns or
elbows

0 ft
(0 m)

1 -5 ft
(0.3-1.5 m)

6-10 .
(1.8-3.0 m)

Length of flexible metal vent

0

120 ft

(36.6 m)

105 ft
(32.0 m)

90 ft
(27.4 m)

1

110 ft

(33.S m)

95 ft
(29.0 m)

80 ft
(24.4 m)

2

100 ft

(30.5 m)

85 ft
(25.9 m)

70 ft
(21.3 m)

Length of rigid metal vent

3

90 ft
(27.4 m)

75 ft
(22.9 m)

60 ft
(1 8.3 m)

4

80 ft
(24.4 m)

65 ft
(1 9.8 m)

50 ft
(1 5.2 m)

5

70 ft
(21.3 m)

55 ft
(1 6.8 m)

40 ft
(1 2.2 m)

Vent system chart - 11 ft (3.4 m) to 25 ft (7.6 m)

t. Install exhaust hood. Use caulking compound to seal exterior wall opening around

exhaust hood.

2. Connect vent to exhaust hood. Vent must fit inside exhaust hood. Secure vent to exhaust

hood with 4" (10.2 cm) clamp.

3. Run vent to dryer location. Use the straightest path possible. See "Determine vent path" in

"Plan Vent System." Avoid 90° turns. Use clamps to seal all joints. Do not use duct tape,

screws or other fastening devices that extend into the interior of the vent to secure vent.

install Leveling Legs

Excessive Weight Hazard

Use two or more people to move and install dryer.

Failure to do so can result in back or other injury.

1.

To protect the floor, use a large, flat piece of cardboard from the dryer carton. Place
cardboard under the entire back side of the dryer.

2. Firmly grasp the body of the dryer (not the top or console panel). Gently lay the dryer on

the cardboard. See illustration.

No. of

turns or
elbows

11-15 ft

(3.4-4,6 m)

16-20 ft

(4.9-6,1 m)

21-25 ft
(6.4-7,6 m)

Length of flexible metal vent

3.

0

75 ft

(22,9 m)

60 ft
(1 8,3 m)

45 ft
(1 3,7 m)

1

65 ft
(19.8 m)

50 ft
(1 5.2 m)

35 ft
(10.7 m)

4.

2

55 ft
(1 6.8 m)

40 ft
(12.2 m)

25 ft
(7.6 m)

Length of rigid metal vent

5.

3

45 ft
(1 3.7 m)

30 ft
(9.1 m)

15 ft

(4.6 m)

4

35 ft
(10.7 m)

20 ft
(6.1 m)

5 ft
(1.5 m)

1.

5

25 ft
(7.6 m)

10 ft

(3.0 m)

0 ft
(0 m)

Install

Vnnt Sys

item

Jim

3.

3, Examine the leveling legs. Find

diamond marking is no longer visible.

Place a carton corner post from dryer packaging under each of the 2 dryer back corners.

Stand the dryer up. Slide the dryer on the corner posts until it is close to its final location.

Leave enough room to connect the exhaust vent.

Using a 4" (1 0.2 cm) clamp, connect vent to exhaust outlet in dryer. If connecting to

existing vent, make sure the vent is clean. The dryer vent must fit over the dryer exhaust
outlet and inside the exhaust hood. Check that the vent is secured to exhaust hood with a
4" (1 0.2 cm) clamp.

4. Once the exhaust vent connection is made, remove the corner posts and cardboard.

17

Advertising
This manual is related to the following products: