Assembly, Unpack carton & install handle (see fig. 2) – Husqvarna 917.29939 User Manual

Page 5

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY

UNPACK CARTON & INSTALL HANDLE
(See Fig. 2)

A

CAUTION: Be careful of exposed

staples

when handling or disposing of carton­

ing material.

IMPORTANT: WHEN UNPACKING AND ASSEMBLINGTILLER,
BE CAREFUL NOT TO STRETCH OR KINK CABLE(S).

Cut

cable ties securing handle column.

Route cable(s) as shown and slide handle column onto
handle mount.
Remove all packing from carton.

Secure handle column using two (2) carriage bolts and
two (2) flange locknuts. Tighten securely.
Cut away carton.

Route tine control cable(s) through plastic cable clip

on handle mount,

NOTE:

Cables must not touch the muffler,

Cut cable ties securing tiller to skid. Remove tillerfrom

skid by pulling backwards,

Remove screws securing depth stake to skid and dis­

card the screws.

INSTALL DEPTH STAKE ASSEMBLY
(See Fig. 3)

Loosen nut “A”,

Insert stake support between engine bracket halves

with stake spring down,

Bolt stake support to engine brackets with bolts, lock

washers and nuts. Tighten securely. Tighten nut 'A',

Depth stake must move freely. If it does not, loosen

support bolt.

HANDLE HEIGHT

Handle height may be adjusted to better suit operator,
(See “HANDLE HEIGHT” in the Service and Adjust­

ments section of this manual),

TILLING WIDTH

Tilling width may be adjusted to better handle your

tilling conditions (See “TINE ARRANGEMENT” in the
Service and Adjustments section of this manual),

TINE OPERATION

Check tine operation before first use, (See “TINE OP­

ERATION CHECK” in the Service and Adjustments

section of this manual).

Advertising