Step 7: adi motor oil to eigine – Troy-Bilt 682J User Manual

Page 9

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Section 2: Assembly

IMPORTANT: Check gear oil level in both

transmissions after the first 2 hours of

new tiller operation, then every 30
operating hours thereafter. See Section 5
for instructions.

Figure 2-12: Checking oil level on
Power Unit Transmission.

Figure 2-13: Checking oil level on

Tine Attachment Transmission.

STEP 7: Adi Motor Oil to Eigine

1. Before adding motor oil, park the tiller
on level ground. Level the engine by
placing a sturdy block under the tines or

the tines depth regulator bar.

2.

Refer to the Engine Owner’s Manual

provided with your tiller for detailed infor­

mation on how to add motor oil and for
motor oil specifications.

IMPORTANT: Two 20 oz. bottles of motor
oil are included with your tiller. Check the
oil level as instructed in the Engine
Owner’s Manual provided with your tiller

BEFORE pouring the full amount of each

bottle into the engine.
IMPORTANT:

Change

engine oil after first 2 hours of

new operation.

Check

engine oil level every 5 hours of

operation or each use.

STEP 8: Attach Engine Throttle

Lever and Cable

For shipping purposes, the throttle cable,

together with the throttle lever, is wound
around the engine. Carefully unwind the
cable. If the throttle control label is
covered with a clear protective coating,

peel it off.

A

WARNING

To avoid electric shock from a short
circuit (electric start tillers

only),

never

allow the throttle cable to touch the
battery. Route cable below the battery,
on the outside of

the

battery holder.

To attach the throttle lever and cable:

1. Run the throttle cable up the inside

edge of the right handlebar and position
the lever as shown in Figure 2-14.

2.

From the outside of the handlebar,

insert the curved head screw (A, Figure 2­
14), through the handlebar and the center
hole in the throttle lever mounting
bracket.

3.

Loosely install the flanged lock nut

and move the throttle lever back to the

STOP position.

4.

From the lever side of the bracket,

thread a pan head screw (B, Figure 2-14)
through the small hole in the throttle lever

bracket and into the handlebar. Tighten

the screw securely.

5. Securely tighten both the flanged lock
nut and the curved head screw.

6

.

Use two plastic ties to secure the

throttle cable to the right handlebar in two

places (Figure 2-15). Loop each tie

around the handlebar and cable (serrated
side faces in) and pull the ties tight. Trim
the ends.

Figure 2-14:

Engine

Throttle Lever

position

and installation.

Figure

2-15: Plastic Ties

placement

on

handlebars.

STEP 9: Adjust Air Pressure in
Tires

For shipping purposes, the tires may be

overinflated. Check the air pressure in
each tire and adjust them to between 10
and 20 pounds per square inch. You

must inflate each tire to equal air

pressures to prevent the tiller from pulling

to one side.

Assembly is complete for recoil start
tillers. See

Assembling The Electric

Start System

if you own an electric

start tiller; otherwise, refer to Section
3.

Controls

for information on tiller

controls.

Advertising