Assembly, Remove tiller from crate, Attach clutch cable (see fig. 7) – Poulan PPRT5C User Manual

Page 7: Check tire pressure, Handle height

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY

.CONNECT SHIFT ROD (See Fig„ 6)

» Insert end of shift rod into hole of shift lever indicator.

® Insert hairpin dip through hole of shift rod to secure.

REMOVE TILLER FROM CRATE

« Make sure shift lever indicator is in “N” (neutral) posi­

tion (See Fig. 6)

® Tiitiiiierforward by lifting handle. Separate cardboard

cover from leveling shield.

« Rotate tiller handle to the right and pull tiller out of

carton.

ATTACH CLUTCH CABLE (See Fig. 7)

® Place shoulder bolt through looped end of clutch cable

and through hole of control bar assembly bracket.

» Assemble 1/4" lock washer and nut and tighten se­

curely.

CHECK TIRE PRESSURE

The tires on your unit were overinflated at the factory for
shipping purposes. Correct and equal tire pressure is

important for best tilling performance.

® Reduce tire pressure to 20 PS! (1.4 kg/cm^).

HANDLE HEIGHT

» Handle heiaht may be adjusted to better suit operator.

(See “TO ADJUST HANDLE HEIGHT’ in the Service

and Adjustments section of this manual).

Advertising